This site uses cookies to remember your language and measure which pages help. Accept all, or keep only what is necessary. Details in our Privacy policy.

Skip to main content

Q4 machinery sourcing week: container programmes up to 12% off

Claim offer

Earthworks & site

All use cases →
6 industry domains · 29 use-case pages · one equipment recommendation eachAll industry solutions →
CMSELL
Behind every order, one sourcing team

From factory search and audit to shipment and spares — the same people see it through, so you are not handed between desks.

About CMSELL

Before you pay, lock the risk down

Escrow release · pre-shipment inspection · dispute handling · after-sales spares
100%Orders under escrow
48hTerms & quote reply
4Protection points
How protection worksPayment methodsProtection terms go straight into the order — no separate contract to sign. Read the full terms
  1. Home
  2. Knowledge
  3. Payment, Tax & Cost
  4. Landed Cost: Six Lines Buyers Underestimate
CMSELL · KNOWLEDGE

Landed Cost: Six Lines Buyers Underestimate

The invoice price is rarely the cost. Six lines — freight, insurance, duty, VAT, port charges and inland haul — decide the real landed number.

Calculator, pen and financial report on a wooden desk
Landed cost is an addition problem; the errors come from the lines people forget to add.

Landed cost equals the goods price plus six lines: international freight, marine insurance, import duty, VAT or its equivalent, port and terminal charges, and inland haulage to site. Buyers budget the first and are surprised by the other five, which together commonly add 15–35% to the invoice value of industrial machinery.

1Why it matters

Two suppliers quoting the same machine at the same FOB price can differ by 10% at your gate, because packing volume, container utilisation and port of loading change the freight line. Landed cost is what your finance team approves, and it is the only number that makes bids comparable across origins.

2The six lines

Line Typical share of landed cost What drives it
Goods (FOB) 60–75% Machine scope and brand
Ocean freight 8–15% Volume, weight, container type, route
Insurance 0.3–1% Cargo value and cover
Import duty 0–15% HS code and trade agreement
VAT / consumption tax 5–25% Destination rules; often recoverable
Port, terminal, clearance 2–5% Destination port and broker fees
Inland haulage 3–10% Distance, axle load, permits

Note the sequence: duty is calculated on a customs value that usually includes freight and insurance, so getting the freight line wrong changes the duty line too.

3Worked example, stated as a method

Take a machine with a goods value of 100. Freight 12, insurance 0.6, giving a customs value near 112.6. At 8% duty that is 9.0; VAT at 20% applies to 121.6 and adds 24.3, recoverable if you are VAT-registered. Port and clearance 3.5, inland 6. The unrecoverable additions are about 31 before VAT recovery, and about 7 with it. The method matters more than the numbers — substitute your own rates.

4Where buyers go wrong

  1. Budgeting FOB as the cost. It is 60–75% of the real number.
  2. Getting the HS code wrong. A pump and a pump set can sit in different lines; the difference is often several points of duty.
  3. Forgetting that duty is computed on freight-inclusive value. Under-declared freight is a compliance risk, not a saving.
  4. Ignoring inland constraints. Axle load and bridge limits can force a different route or a permit, sometimes more than the freight itself.
  5. Treating VAT as a cost. If recoverable, it is a cash-flow item, not a margin item.

5Numbers to fix before you enquire

Item Range Why
Goods value — Base of everything
Gross weight / volume Per machine Freight basis
HS code 6-digit plus national digits Duty rate
Duty and VAT rates Per destination Landed cost
Inland distance and limits km, axle load Final leg

6Tools & next

Give us the machine, the destination port and the inland address; we will return a landed-cost sheet with the six lines and the duty basis stated. Related reading: how Incoterms move the risk point, and what documents customs will ask for on a machine shipment.

Key facts. Landed cost is the goods price plus six lines: ocean freight, marine insurance, import duty, VAT or equivalent, port and terminal charges, and inland haulage. Together those lines commonly add 15–35% to the invoice value of industrial machinery, so a machine quoted at 100 FOB can cost 120–135 at the site gate before VAT recovery. Duty is assessed on a customs value that normally includes freight and insurance, which means an error in the freight line also changes the duty line. HS classification decides the duty rate and can differ between a component and an assembled unit. Inland axle-load and bridge limits can add permit costs that exceed the ocean freight on short routes. This article covers cost build-up only; it does not cover trade agreements, tax advice or customs valuation disputes.

—

Published 25 November 2026 · 4 min read · Knowledge column.

Need this checked against your site?

Send the working condition, the quantity and the destination port. The desk answers with a written specification and a traceable price — not a brochure.

WhatsApp