This site uses cookies to remember your language and measure which pages help. Accept all, or keep only what is necessary. Details in our Privacy policy.
NecessaryAlways on
Language, security and your choice on this banner. The site does not work without these.
Counts page views on our own server. No third-party analytics, no advertising profile, no cross-site identifier.
Saved. Change it any time from Cookie settings in the footer.
One application with a fixed path: documents, review, audit, decision. This page is that
application — what to send, how long each stage takes, and what a returned file costs you
in days.
Five checks, one decision — nothing is approved on paperwork alone
A reference number from the first minute; every message carries it
Ten to fifteen business days end to end, remote audit
Selling through a trading company? The audit follows the factory, not the invoice address —
see the name-match rule.
Application VA-000418Example
Verification statusDay 6 of ~12
SubmittedDay 0 · reference issued
Documents reviewedDay 5 · one file returned
3Audit bookedDay 7 · remote, 60 min
4AuditGate to packing line
5DecisionGrade and reasons in writing
Business licenceMatched
ISO 9001 certificateReturned
Factory leaseMatched
Clock paused at day 5 while the certificate is re-sent.
Before you start
Six documents, one naming rule
The reviewer is checking that the licence, the certificates and the account describe the same company at the same address. Send these six and most of the back-and-forth never happens.
That the legal entity exists, and that its registered scope covers the machines you want to list.
Colour scan of every page, annexes included.
Registration number and validity date readable at 100%.
Name spelled exactly as it will appear on the account.
PDF · all pages
Factory tenure
02
That you operate the site the auditor will walk — owned, or leased with time left on the contract.
Property certificate, or a lease with 12+ months remaining.
Address matching the licence, or a filed branch record.
One exterior photo showing the site sign at the gate.
PDF + 2 photos
Capacity evidence
03
What you can actually ship in a month, by product family — not a peak week.
Equipment list with model and year of manufacture.
Monthly output per product family, last quarter.
Line count and shift pattern behind that number.
XLSX or PDF
Quality system
04
That output is inspected between production and packing, and that the test gear is calibrated.
ISO 9001 or the national equivalent, current.
Calibration records for the measuring equipment.
One incoming and one final inspection sheet, filled in.
PDF
Product compliance
05
That the models you list may legally be sold in the markets you name.
CE, EPA or CCC as your destination markets require.
Test report from an accredited laboratory.
Annex listing the models the certificate covers.
PDF, unredacted
Export record
06
That goods have cleared customs under your name in the past year.
Three to five bills of lading or export declarations.
Buyer names and prices may be blacked out.
Keep HS code, product description and date visible.
PDF
PDF, JPG or PNGColour, 200 dpi or better. A phone photo of a monitor is not a scan.
10 MB per fileLarger sets go as one shared folder link — not twelve separate emails.
English, or translatedA stamped translation page is enough. No notarisation.
company_document.pdfOne document per file, named after the company and the document type.
Not on the list: a bank statement, a tax number on its own, or a product brochure.
They arrive often and never move an application forward. If you are unsure whether a document
counts, ask before sending it — the desk answers that question in a day.
Timeline
Five stages, with the clock shown
The times below are typical for a complete application. The clock stops whenever a file is
returned to you and restarts when the replacement lands — so a missing annex on day one is
not a one-day problem, it is a week.
Send the application below. A reference number appears on screen and lands in your inbox — every later message, document and status question is filed against it.
By day 2
02
Completeness pre-check
Desk
An officer checks that the set is complete and that the names match across licence, certificates and account. If something is missing you get the exact list, not a general request to resubmit.
Day 2–7
03
Document review
Desk
Licence, tenure, capacity and certificates are checked against the issuing body, not just read. Questions arrive as one consolidated list, so you answer once instead of six times.
Booked in 3 days
04
Audit
Both
Remote video walk of 60–90 minutes, or an on-site visit. You receive the route and the checklist beforehand, so nobody improvises on the day and nothing is asked for that you were not told to prepare.
Within 3 days
05
Decision
Desk
Outcome, grade and reasons in writing. An approved applicant gets the badge and workspace access the same day; a refusal gets the gap named, mapped to the dimension it failed.
What is audited
Five dimensions, evidence for each
This is the summary. The published standard carries the definitions, the grade ladder and the appeal route — this page only tells you what the auditor will be looking at.
Legal entityWhat is checked
Who is accountable for the listing, and whether that entity may trade these products at all. Evidence used
Licence, registration record, signatory authorisation.
Production lines & capacityWhat is checked
Whether the machines are built on a line you control, at the volume you claim on the listing. Evidence used
Equipment list, line walk, output records, shift pattern.
Quality systemWhat is checked
Whether inspection happens between production and packing, and whether the results are recorded. Evidence used
ISO certificate, calibration records, inspection sheets.
Export recordWhat is checked
Whether goods have cleared customs under your name in the last twelve months. Evidence used
Bills of lading, declarations, commercial invoices.
Response commitmentWhat is checked
Whether a buyer question gets an answer inside the published window, including holidays. Evidence used
Named contact, working hours, escalation route.
Grades and badge entitlements are defined in the standard, not restated here.
Two suppliers can both be verified and still rank differently — the grade records what was
audited, and it is printed on the badge so a buyer can tell the difference.
Verification is a state, not a certificate on the wall
Four things change once you are verified — and three of them are obligations rather than rewards.
Validity and re-audit
A badge is valid for twelve months. Renewal opens sixty days before expiry and reuses documents that have not changed — a lapsed badge is removed, not greyed out.
Scope extensions
Adding a product family means evidence for that family only: the certificates, the model list, and a walk of the cell that builds it. The rest of the file is not re-opened.
Changes you must report
Legal name, registered address, ownership or a factory relocation: within thirty days. Name and address changes re-open the licence check, so report them before a buyer notices.
Downgrade and removal
A failed re-audit, a certificate left unrenewed, or a substantiated misrepresentation removes the badge and unpublishes the listings. Fourteen days to appeal with evidence.
Returned files
Why applications come back
Six reasons account for most returns. Each one is cheaper to fix before you submit than after the clock has already started.
Why it comes backWhat fixes it
Why it comes back
The licence names one company, the certificates name another, and the account names a third.
What fixes it
Apply under the entity that owns the factory. If you sell through a trading arm, add a signed authorisation linking the two — one page is enough.
Why it comes back
The registered scope does not cover the machines in the application.
What fixes it
Either narrow the application to covered categories, or send the manufacturer's licence with the trading authorisation attached.
Why it comes back
A certificate arrives without the model annex, or with a validity date already passed.
What fixes it
Send the annex that lists your models and the current certificate. An expired certificate cannot be accepted "pending renewal".
Why it comes back
The photos do not prove the site that was applied for.
What fixes it
One continuous walk from the gate to the line, filmed on the day, with the site sign in the first frame. Geotagged stills are accepted as a supplement, never as the only proof.
Why it comes back
Capacity is claimed in the covering letter but not in any document.
What fixes it
Monthly output by product family, backed by the equipment list and the shift pattern. A number without a calculation behind it does not count.
Why it comes back
Export records are redacted until the product itself is unreadable.
What fixes it
Black out buyer names, prices and addresses only. Keep the HS code, the description and the shipment date — those are what the check turns on.
Application
Start the application
About six minutes. You do not attach documents here — the reference number you receive is what the desk files them against, and the checklist in your confirmation email tells you exactly what to send.
Scope
How an application is judged
Verification is run by the platform’s own desk, not by the sales team. An application is judged on the five dimensions set out on this page and on nothing else: company size, advertising spend and the length of any existing relationship do not move a file forward.
Documents sent with an application are used for the audit and kept on the application record. They are not published, not passed to buyers and not used in a listing. Buyers see the badge, the grade and the audit date — never a licence, a certificate or a customer name.
A returned application keeps its reference number and its place in the queue. Sending a fresh application instead of replying to the return starts the clock again at day zero, which is why the desk always asks for the reference first.
Privacy
Documents are visible to the verification desk and the auditor on your file. They are never
published, never shown to buyers, and never used in a listing.
The seven questions the verification desk answers most often.
How long does verification take?
Ten to fifteen business days from a complete submission to a decision, for a remote audit. An on-site visit adds scheduling time — usually three to five weeks end to end, depending on where the factory is. The clock pauses every time a file is returned to you, which is why the first submission carries so much weight.
Can I correct the application after sending it?
Yes, while it is in pre-check or review. Reply to the confirmation email with your reference number and the corrected document. Once the audit is booked, a correction normally means the review is re-opened, so it is much quicker to fix things early.
We are a trading company, not the factory. Can we apply?
Yes, if the factory you represent is named in the application and you hold a signed authorisation to sell its output. The audit follows the factory, and the badge names both the trading entity and the site that was walked.
Is a factory visit compulsory?
Not always. A scheduled video walk works for most single-site factories: gate to packing line, with the equipment list in hand. On-site visits are used for multi-line factories, first-time applicants in some categories, and re-audits where the records and the claims disagree.
What does it cost?
Applying costs nothing and commits you to nothing. Any fee that applies to your category — membership, on-site travel, optional promotion — is quoted in writing before it is due, with the date of the schedule it comes from.
What happens if the application is refused?
You receive the reasons in writing, mapped to the five dimensions, and fourteen days to appeal with additional evidence. The refusal sits against that application, not against the company: once the specific gap is closed you can apply again, and the old file is read as context rather than as a penalty.
Can we publish listings while the review is running?
Drafts yes, public listings no. Build the catalogue and save it unpublished, so the day the badge is issued the listings go live without another round of data entry. Public pages and RFQ routing open with verification, not before.
Send the company profile before the application. The desk will tell you which of the six
documents you can already produce, and which one will hold the file up — that answer costs
nothing and usually saves a week.