This site uses cookies to remember your language and measure which pages help. Accept all, or keep only what is necessary. Details in our Privacy policy.

Skip to main content

Q4 machinery sourcing week: container programmes up to 12% off

Claim offer

Earthworks & site

All use cases →
6 industry domains · 29 use-case pages · one equipment recommendation eachAll industry solutions →
CMSELL
Behind every order, one sourcing team

From factory search and audit to shipment and spares — the same people see it through, so you are not handed between desks.

About CMSELL

Before you pay, lock the risk down

Escrow release · pre-shipment inspection · dispute handling · after-sales spares
100%Orders under escrow
48hTerms & quote reply
4Protection points
How protection worksPayment methodsProtection terms go straight into the order — no separate contract to sign. Read the full terms
  1. Home
  2. Services
  3. After-sales & spare parts
CMSELL · After-sales

The machine is on site. Now what?

Everything after arrival, in the order it comes up: the first 72 hours, what the warranty carries and what it does not, how a part number becomes a part on a truck, and how to get a fault looked at without waiting a fortnight for a visit.

  • Arrival, warranty, parts, diagnostics — no catalogue here
  • Parts quoted against the serial, so the revision matches
  • Claims and escalation link across, never duplicated

Machine still being specified? The pre-shipment check is on the Quality inspection page.

Service ticket · AS-2026-0473 Open
  1. Reported 6 Nov · video + code
  2. Diagnosed 7 Nov · seal kit
  3. Dispatched 8 Nov · in transit
  4. Closed After fitment
  • Fault Boom drift, 40 mm in 10 min · 1,860 h
  • Part Seal kit 991-00421 · dispatched 8 Nov
  • Next Remote session to confirm after fitment

Opened 6 Nov · part dispatched in 2 working days · no site visit needed.

First 72 hours

Four steps, in this order

Step one is the one people skip, and the one every later claim depends on.

  1. 01 Hour 0

    Unload and photograph

    Seal, doors and the load before anything comes out, then the machine from four sides. Timestamped and unedited — these are the photographs a claim is decided on in month three, not month one.

    You
  2. 02 Hours 1–4

    Check against the documents

    Packing list, bill of lading, serial plate. A missing attachment or the wrong bucket is cheapest to fix while the container is still on the yard.

    You + supplier
  3. 03 Day 1–2

    Commission and run in

    Fluids, torque check, thirty minutes at no load, then one working cycle. Record the hour meter at handover — every later interval is measured from that number.

    Supplier + you
  4. 04 Day 1–3

    Open the machine record

    Serial, hour meter, attachments, and the part numbers on the wear items. It is the page you will read in month eight, when nobody remembers which seal kit was fitted.

    You

If something is wrong on arrival, say so before the container is cleared. A shortfall found on the yard is a document correction; the same shortfall found a week later is a claim. The window and the evidence are set out on Buyer protection.

Warranty

What the warranty carries, and where it stops

Standard terms below. Your order documents are the version that binds.

Standard term 12 months or 2,000 hours, whichever comes first · extended terms are negotiated with the supplier, not with the platform · the clock starts at handover, not at invoice

Covered

  • Manufacturing defects in major components
  • Hydraulic and transmission failures inside the period, where the machine ran within rating
  • A machine that does not match the signed annex
  • Parts replaced under warranty, for the remainder of the original period
  • Labour, where the repair is carried out by an authorised workshop

Not covered

  • Wear parts: filters, teeth, belts, tyres, hoses, brake linings
  • Damage from running beyond rated capacity, or on unapproved fuel
  • Repairs by a third party without written approval
  • Cosmetic wear: paint, decals, seat covers, cab trim
  • Consequential loss: downtime, lost contracts, hire of a replacement

The platform does not perform repairs. The warranty is the supplier obligation, and the workshop that carries it out is named on the order. What CMSELL does is keep the order terms enforceable: a warranty dispute can pause the release of held funds while it is decided.

How funds are held during a dispute
Spare parts

From a part number to a part on a truck

Three steps. The first one decides whether the second one is quick.

Browse the parts catalogue
  1. 01

    Find the number

    Serial plate on the frame, then the parts list issued with the machine. One number per position — a photograph identifies a part, but it does not order one.

  2. 02

    Send serial and number

    The desk quotes against the serial so the revision matches the machine. Add the quantity and the hour meter; both change what is recommended.

  3. 03

    Quote, pay, dispatch

    Stock items leave in two to four days. Castings and controllers made to order take three to five weeks. Freight is quoted on its own line, never bundled.

Where the part number lives

Serial plate

Stamped on the frame, right-hand side, behind the front axle. The model, serial and year are on one line.

Parts list

Issued as a PDF with the machine documents. It lists positions, not photos — match the position, then the number.

Wear-plate stamps

Cast into the part itself on buckets, teeth and cutting edges. Useful when the parts list has gone missing.

No part numbers on this page, on purpose. A catalogue copied into a service page goes stale within a quarter; the one in Products is the one the desk quotes from, with stock and lead time attached.

Remote diagnostics

A fault, without waiting for a visit

Most hydraulic and electrical faults are diagnosed from a video and two numbers. The visit is the expensive step — the point of the ticket is to make sure it is only booked when it is the only option left.

What to send with the ticket

  • A ten to twenty second video of the fault, sound on
  • The fault code from the display, not a description of it
  • Hour meter reading and the serial number
  • What changed before it started: fuel, filter, operator, attachment
  • The pressure reading, if the machine has a gauge for that circuit
  1. 01

    Submit

    Acknowledged the same working day

    Serial, fault code and the video. A ticket without those three gets a reply asking for them, which costs a day.

  2. 02

    Triage

    Within 1 business day

    The desk names the system and the likely part, and says whether this is a remote fix, a part, or a site visit.

  3. 03

    Remote session

    Booked within 2 days

    A video call at the machine, with the technician watching the gauge or the fault appear. Most hydraulic and electrical faults end here.

  4. 04

    Resolve

    Part, procedure, or visit

    A part dispatched, a procedure in writing, or a visit booked by the supplier. Under warranty, the claim runs alongside the ticket.

Wear-parts list

A template you fill once and keep

One row per part, one sheet per machine. Filled at handover, it turns "we need a seal kit" into a number and a lead time.

Hydraulic return filter Boom circuit · position 3 2,000 h 1
Bucket teeth, standard Bucket · 5 positions 800 h 5
Boom cylinder seal kit Boom cylinder 4,000 h 1

Wear-parts list template

Nine columns: model, serial, part number, description, position, quantity, interval, last replaced, notes. Two example rows, six blank ones, no macros.

Download the CSV

CSV · opens in any spreadsheet · 1 KB

This is a record, not a maintenance schedule. Intervals for your machine come from its own manual; the method — what to check, when, and with what — is in the Knowledge directory.

What this page is

A sequence, not a catalogue

After-sales is a service page, not a catalogue. Part numbers, prices and stock are in Products; the method for maintaining a machine — intervals, lubrication, wear limits — is in the Knowledge directory and is not repeated here. The help center already answers the operational questions, so this page links to it rather than restating it.

What this page does commit to is sequence: check on arrival, log the record, keep the wear list, quote parts by serial, and diagnose before dispatching a technician. Most of the disputes we see start where one of those five was skipped.

Where a warranty term here differs from the term in your order documents, the order documents win.

Send the serial and the fault code

A ticket with the serial, the fault code and a fifteen-second video is answered in one round. Without them, the first reply is a request for exactly those three things — and that reply costs a day. Send it before the machine is stripped down, not after.

WhatsApp