Freight split the market in two this month
Container rates to the Gulf fell 9.3% while rates to South America rose 4%. The same machine, the same factory, two different landed costs — and a CIF quote that was right in September is not right now.
This site uses cookies to remember your language and measure which pages help. Accept all, or keep only what is necessary. Details in our Privacy policy.
Language, security and your choice on this banner. The site does not work without these.
Counts page views on our own server. No third-party analytics, no advertising profile, no cross-site identifier.
One note a month for people who have to quote: plate and freight prices, model changes, rules with dates on them, and how far out the factories are running. Written from the quotes and documents a sourcing desk actually handles.
Looking for method rather than news — how to read a spec sheet, how landed cost is built? That is the Knowledge directory.
▲ higher than last month · ▼ lower · flat where the number did not move. Next issue 1 December 2026.
One lead story, three shorter notes. Every row below repeats numbers from the tables further down.
Container rates to the Gulf fell 9.3% while rates to South America rose 4%. The same machine, the same factory, two different landed costs — and a CIF quote that was right in September is not right now.
Month on month, and against the same month last year. Ranges we were quoted, mid-point, before negotiation.
CNY per tonne, mid-point of quoted ranges. The November step is the 6.4% row in the table.
Built from the mid-point of our own quote ranges, not from a published index. Treat the shape as the signal and the table above as the number.
A price row is not a quotation. The table says what the market did; it does not say what your order costs. Configuration, quantity and Incoterm move a quote further than a month of index movement.
Only changes that affect what you receive or what you pay — not every facelift that reached a dealer bulletin.
Both paired it with a four-speed powershift and a revised cooling pack. The outgoing models are being discounted through Q1 2027, which is the cheaper buy if the duty cycle is light.
Three of the six suppliers we track now quote within 3% of the diesel equivalent, before any subsidy. Charging infrastructure is still the deciding cost, not the machine.
Three of four suppliers switched the wear liner as standard rather than as an option. Worth checking on older stock: the same model number can carry either liner.
Regulation only makes this page when it has a date attached and a document behind it.
Machines built before this date can still be placed on the market inside the derogation window. The build date on the plate decides it, not the date on the invoice.
Importers will need embedded-emission data from the mill rather than a default value. Ask the supplier for the mill certificate now; retrofitting the figure later is the expensive path.
Certificates of origin for machinery above the threshold need chamber legalisation before consular stamping. Budget five to seven working days, and check the threshold against your invoice value.
A product certificate of conformity no longer clears a consignment on its own. Each shipment needs its own certificate, issued against the invoice and the packing list.
Dates are as published when this note went out. They move, and a provisional date is labelled as provisional rather than rounded to a quarter. Confirm with your certification body or customs broker before you plan a shipment against one.
Quoted production time from order confirmation, before inspection and before freight. Add two to three weeks for a sea leg.
Four inputs, one page, published on the first working day of the month.
The mid-point of the ranges we were quoted that month, from at least six suppliers per line. We do not publish an index of our own.
Published spot rates for 40ft containers on the lanes our buyers actually ship. Contract rates move later, and less.
OEM release notes and dealer bulletins, confirmed against a specification sheet — not against a conversation at a trade fair.
The issuing body publication itself. Where a date is provisional, the row says so instead of rounding it off.
12 issues a year · published on the first working day · about 8 minutes to read · no sponsored rows, no supplier pays to appear in a table.
These notes are dated. They describe what moved in a month and what to check before quoting; they do not teach method. Evergreen explanation — how to read a spec sheet, how landed cost is built, how an Incoterm shifts risk — lives in the Knowledge directory and stays undated.
Nothing here is about CMSELL. Company announcements belong to Press, and what a buyer did with a machine belongs to Success stories. This column watches the market the way a sourcing desk does: prices, freight, launches, rules, lead times.
Where a number here disagrees with the quote in front of you, the quote wins. These rows are the mid-point of what we saw that month, not a price list.
One email, eight minutes, no product offers. The form sits in the footer at the bottom of this page — one field, no account, and it is the only form on the site that subscribes you to anything.