This site uses cookies to remember your language and measure which pages help. Accept all, or keep only what is necessary. Details in our Privacy policy.

Skip to main content

Q4 machinery sourcing week: container programmes up to 12% off

Claim offer

Earthworks & site

All use cases →
6 industry domains · 29 use-case pages · one equipment recommendation eachAll industry solutions →
CMSELL
Behind every order, one sourcing team

From factory search and audit to shipment and spares — the same people see it through, so you are not handed between desks.

About CMSELL

Before you pay, lock the risk down

Escrow release · pre-shipment inspection · dispute handling · after-sales spares
100%Orders under escrow
48hTerms & quote reply
4Protection points
How protection worksPayment methodsProtection terms go straight into the order — no separate contract to sign. Read the full terms
  1. Home
  2. Services
  3. Sourcing intelligence
CMSELL · Sourcing intelligence

What moved in the market this month

One note a month for people who have to quote: plate and freight prices, model changes, rules with dates on them, and how far out the factories are running. Written from the quotes and documents a sourcing desk actually handles.

  • Dated, sourced, and short enough to read before a call
  • Prices as ranges we were quoted — no index of our own
  • Regulation rows carry the date and who issued it

Looking for method rather than news — how to read a spec sheet, how landed cost is built? That is the Knowledge directory.

Sourcing note Issue 11
11
November 2026 Published 2 November 2026 · 8 min read
  • Steel plate, Q235 20mm CNY 3,720/t +6.4%
  • Shanghai → Jebel Ali, 40ft USD 1,480 −9.3%
  • Stage V transition stock 60 days left 31 Dec

▲ higher than last month · ▼ lower · flat where the number did not move. Next issue 1 December 2026.

Issue 11

Four things worth knowing before you quote

One lead story, three shorter notes. Every row below repeats numbers from the tables further down.

Freight

Freight split the market in two this month

Container rates to the Gulf fell 9.3% while rates to South America rose 4%. The same machine, the same factory, two different landed costs — and a CIF quote that was right in September is not right now.

2 Nov 2026 · 4 min read

−9.3% Shanghai → Jebel Ali
+4.0% Shanghai → Santos
−21% year on year, Gulf lane
Prices

Steel plate up 6.4%: what it does to a 20-tonne machine

Plate is roughly a fifth of the bill of materials on a 20-tonne excavator. Quotes will follow in four to six weeks, not this week — which is the window to lock a price.

Regulation

Stage V stock: the question is the build date

Machines built before the transition closes can still be placed on the market. Ask for the build date on the plate, not the invoice date — the two are months apart on stock units.

Launches

Electric mini excavators reached parity — on one class

In our quote sample, 2-tonne electric units closed the gap with diesel this month. Below 1.8 tonnes they are still 18% dearer, and above 3 tonnes the battery stops paying for itself.

Prices & freight

Six lines we watch, and where they moved

Month on month, and against the same month last year. Ranges we were quoted, mid-point, before negotiation.

Steel plate, Q235 20mm · CN CNY 3,720 / t +6.4% +1.8%
Hot-rolled coil, export FOB · CN USD 512 / t +3.1% −2.4%
40ft container, Shanghai → Jebel Ali USD 1,480 −9.3% −21.0%
40ft container, Shanghai → Santos USD 3,120 +4.0% +12.6%
Hydraulic hose, DIN 2SN · CN CNY 18.40 / m −1.2% −4.1%
Diesel, 0# retail average · CN CNY 7.12 / L +0.8% +3.5%

Steel plate, Q235 20mm · twelve months

CNY per tonne, mid-point of quoted ranges. The November step is the 6.4% row in the table.

3,800 3,600 3,400 3,720 Dec Mar Jun Sep Nov

Built from the mid-point of our own quote ranges, not from a published index. Treat the shape as the signal and the table above as the number.

A price row is not a quotation. The table says what the market did; it does not say what your order costs. Configuration, quantity and Incoterm move a quote further than a month of index movement.

Model watch

Three changes worth checking before you order

Only changes that affect what you receive or what you pay — not every facelift that reached a dealer bulletin.

Wheel loaders · 5 t class

Two OEMs moved to common-rail engines in the same month

Both paired it with a four-speed powershift and a revised cooling pack. The outgoing models are being discounted through Q1 2027, which is the cheaper buy if the duty cycle is light.

In production · first units Q1 2027

Mini excavators · 1.8–2.5 t

Electric variants closed the price gap on the 2 t class

Three of the six suppliers we track now quote within 3% of the diesel equivalent, before any subsidy. Charging infrastructure is still the deciding cost, not the machine.

Available now · 6–8 weeks

Crusher buckets · 0.8–1.2 m³

Hardox 450 liners became standard, and the price did not move

Three of four suppliers switched the wear liner as standard rather than as an option. Worth checking on older stock: the same model number can carry either liner.

Available now · 3–4 weeks

Rules & dates

Four dates that change what can ship

Regulation only makes this page when it has a date attached and a document behind it.

  1. 31 Dec 2026 European Union

    Stage V transition stock closes

    Machines built before this date can still be placed on the market inside the derogation window. The build date on the plate decides it, not the date on the invoice.

  2. 1 Jan 2027 European Union

    CBAM definitive period begins for iron and steel

    Importers will need embedded-emission data from the mill rather than a default value. Ask the supplier for the mill certificate now; retrofitting the figure later is the expensive path.

  3. 1 Apr 2027 Egypt

    Chamber legalisation required above a value threshold

    Certificates of origin for machinery above the threshold need chamber legalisation before consular stamping. Budget five to seven working days, and check the threshold against your invoice value.

  4. Ongoing Saudi Arabia

    SABER certificates are per shipment

    A product certificate of conformity no longer clears a consignment on its own. Each shipment needs its own certificate, issued against the invoice and the packing list.

Dates are as published when this note went out. They move, and a provisional date is labelled as provisional rather than rounded to a quarter. Confirm with your certification body or customs broker before you plan a shipment against one.

Lead times

How far out the factories are running

Quoted production time from order confirmation, before inspection and before freight. Add two to three weeks for a sea leg.

Mini excavators · 1.5–3 t 4–6 weeks Longer than last month
Wheel loaders · 3–5 t 3–5 weeks Unchanged
Jaw crushers · 20–30 t/h 8–10 weeks Shorter than last month
Skid-steer loaders 5–7 weeks Longer than last month
Attachments · buckets, breakers 2–3 weeks Unchanged
How it is built

Where the numbers come from

Four inputs, one page, published on the first working day of the month.

Price rows

The mid-point of the ranges we were quoted that month, from at least six suppliers per line. We do not publish an index of our own.

Freight rows

Published spot rates for 40ft containers on the lanes our buyers actually ship. Contract rates move later, and less.

Launch rows

OEM release notes and dealer bulletins, confirmed against a specification sheet — not against a conversation at a trade fair.

Regulation rows

The issuing body publication itself. Where a date is provisional, the row says so instead of rounding it off.

12 issues a year · published on the first working day · about 8 minutes to read · no sponsored rows, no supplier pays to appear in a table.

What this column is

Dated news, and its three neighbours

These notes are dated. They describe what moved in a month and what to check before quoting; they do not teach method. Evergreen explanation — how to read a spec sheet, how landed cost is built, how an Incoterm shifts risk — lives in the Knowledge directory and stays undated.

Nothing here is about CMSELL. Company announcements belong to Press, and what a buyer did with a machine belongs to Success stories. This column watches the market the way a sourcing desk does: prices, freight, launches, rules, lead times.

Where a number here disagrees with the quote in front of you, the quote wins. These rows are the mid-point of what we saw that month, not a price list.

Once a month

Get the note on the first working day

One email, eight minutes, no product offers. The form sits in the footer at the bottom of this page — one field, no account, and it is the only form on the site that subscribes you to anything.

WhatsApp