This site uses cookies to remember your language and measure which pages help. Accept all, or keep only what is necessary. Details in our Privacy policy.

Skip to main content

Q4 machinery sourcing week: container programmes up to 12% off

Claim offer

Earthworks & site

All use cases →
6 industry domains · 29 use-case pages · one equipment recommendation eachAll industry solutions →
CMSELL
Behind every order, one sourcing team

From factory search and audit to shipment and spares — the same people see it through, so you are not handed between desks.

About CMSELL

Before you pay, lock the risk down

Escrow release · pre-shipment inspection · dispute handling · after-sales spares
100%Orders under escrow
48hTerms & quote reply
4Protection points
How protection worksPayment methodsProtection terms go straight into the order — no separate contract to sign. Read the full terms
  1. Home
  2. For suppliers
  3. Join as supplier
CMSELL · Supplier programme

Sell where buyers already compare specifications

Machinery buyers do not browse brochures. They shortlist three to five factories, line up the specifications, and ask each one the same question. This programme is how a factory gets onto that shortlist — and stays on it after the first order.

  • Six documents, one video walk, a decision in ten to fifteen business days
  • Free to apply, free to be audited, no listing fee
  • No exclusivity, no minimum volume, your prices stay yours

Already trading through an export agent? The audit follows the factory, not the invoice address — see the trading-company rule.

Why factories join

Four things a listing here does that a website cannot

Each one is a mechanism, not a promise — and each is checked before the badge is issued.

01

Buyers who are already comparing

Requests arrive as a specification — tonnage, working condition, quantity, destination port — not as a one-line "best price?" email.

  • Every RFQ states the trade term and the port, so a quote is arithmetic, not a guess.
  • Filter by category, market and quantity before you spend an hour on a reply.
02

Requests sized to your line

Your documented monthly output per product family is part of the file, so routing sends you requests you can actually build this month.

  • Capacity is recorded by family, not as one factory-wide number.
  • Quantity and lead time on a request are checked against it before it reaches you.
03

A badge buyers can check

The badge, the audit date and the export record sit beside your name in every listing — buyers see what was checked, and when, instead of taking your word for it.

  • Verified suppliers are filtered in, not out, on machinery searches.
  • The audit date is visible, so a current badge keeps doing work after year one.
04

Documents that match the order

Proforma, packing list, bill of lading and the certificate set come off the same order record, so the paperwork cannot drift from what was sold.

  • One order record carries the trade term through to the documents.
  • Documents already verified for the badge are reused rather than re-collected.
Admission

Six criteria, applied the same way to everyone

There is no fast track and no size threshold. A file moves when these six are evidenced, and stops at whichever one is not.

Read the full standard
01

You make what you list

The applying entity manufactures the machines, or holds signed manufacturing rights for them. A trading arm can apply, but the audit still follows the factory.

EvidenceLicence scope, factory walk

02

The site is yours to open

Owned, or leased with more than twelve months left on the contract — long enough that the site you were audited at is still the site next year.

EvidenceProperty certificate or lease

03

Capacity is documented by family

Monthly output per product family for the last quarter, with the line count and shift pattern behind the number. A peak week is not a capacity.

EvidenceEquipment list, output record

04

Output is inspected before it ships

A quality system that catches defects between production and packing, and measuring equipment that is in calibration.

EvidenceISO 9001 or national equivalent, inspection sheets

05

You have exported under your own name

Goods cleared customs under the applying entity in the last twelve months. Buyer names and prices may be blacked out; HS code, description and date may not.

EvidenceThree to five bills of lading or declarations

06

Your models may be sold where you ship

CE, EPA or CCC as the destination markets require, with the annex that lists the models the certificate actually covers.

EvidenceCertificate plus model annex

The six documents that evidence these criteria — formats, sizes and the exact pages required — are on the application page. See the document checklist

Cost

The honest version of what joining costs

Applying is free, the audit is free, and there is no listing fee. What it costs is attention: six documents, one video walk, and someone who can answer questions about capacity and certificates for forty minutes without checking with a colleague.

  • Money. Commission, optional promotion and third-party inspection are commercial terms, set out in the onboarding pack before anything goes live.
  • Time. Ten to fifteen business days for most single-site factories, counted in working days from a complete file.
  • Attention. The person on the walk should know the line count, the shift pattern and which certificate covers which model.

The clock only runs on a complete file. A returned document pauses it; a brand-new application restarts it at day zero.

Stage Typical
Application form ~10 min Eleven fields. No uploads, and no account needed before you start.
Documents to assemble 6 items Most factories already hold four. The export record is the usual gap.
Desk pre-check 2 business days A date, or the exact gaps — not a "pending".
Remote verification 10–15 days From a complete file to a decision, working days.
On-site audit, if required 3–5 weeks Multi-line plants, some categories, and re-audits.

On-site visits are the exception, not the rule: most single-site factories are verified on a scheduled video walk.

Onboarding

Four steps, with the work on both sides written down

Nothing in this sequence waits on a sales call — each step ends with something in your inbox.

Open the application
  1. 01 Day 0

    Apply

    YouFill the eleven-field form. A reference number comes back on screen and by email.

    DeskOpens the file and sends the checklist with the file rules attached.

  2. 02 By day 2

    Credential review

    YouSend the six documents in one email, as PDFs or scans.

    DeskPre-checks them and lists gaps by document, not by paragraph.

  3. 03 Days 2–7

    Verification

    YouA scheduled video walk, gate to packing line, about forty minutes.

    DeskCross-checks the claims against records and escalates to a site visit if they disagree.

  4. 04 Day of decision

    Live

    YouSet up the catalogue: specification, MOQ, lead time, trade terms.

    DeskIssues the badge with its audit date and indexes the listing in its category.

Where the handoff happens

The application itself lives on its own page: the eleven-field form, the six-document checklist and the file rules. This page stops at the door — deliberately, so there is one place to submit and one place to check status.

Go to the application
The day the badge lands

What opens up

Four surfaces, one account. The seller centre is where all of it is managed.

Tour the seller centre

Listings

Live in the category buyers filter, with a from-price or quotations only. Price, MOQ and lead time stay editable without breaking a link a buyer already saved.

RFQ inbox

Quantity, working condition and destination port attached to every request, filtered by category, market and quantity before you open one.

Quotations

Structured quotes, saved as templates and reused per market — the fifth Nigerian buyer costs a paragraph, not an afternoon.

Orders

One record from proforma to bill of lading, with the certificates already verified for the badge attached rather than re-collected.

Before you apply

Five lines to check tonight

Self-check

Nothing here is sent or saved — it is a five-minute way to see where the gaps are. Each line you cannot tick is what comes back as a query later; it is rarely a refusal, but it costs a week.

Most files that stall are not weak factories. They are factories whose licence names one company, whose certificates name a second and whose trading account names a third — three genuine documents that do not add up to one story. The desk reads a file the way a buyer reads a listing: does the entity selling the machine match the entity that builds it, and can both be traced to a site that somebody has walked.

Consistency therefore matters more than volume. A single-site factory with a current certificate, a clean lease and five export declarations moves through faster than a large group with a decade of catalogues and a licence that expired in March. Sending forty pages where six are asked for does not shorten the review; it usually moves the review to the pages nobody asked about.

If a document genuinely does not exist, say so in the application instead of sending a substitute. A declared gap gets a workaround — a supplier letter, a bank record, an interim certificate. A covered-up gap gets the file returned, and a return is the one part of this process that reliably costs a week.

Questions

Asked before joining

Seven questions from factories that had not applied yet.

Do I have to be verified before I can list?

For machinery categories, yes. The catalogue is built as a draft while the file is open, so nothing is lost — but listings only publish once the badge is issued. It keeps a half-audited factory from competing on the same shelf as an audited one.

What does joining actually cost?

Applying is free and the audit is free. There is no listing fee and no fee per quotation. Commission, optional promotion and third-party inspection are commercial terms, and they are set out in the onboarding pack before anything goes live — nothing is deducted from a quotation you did not accept.

Can I apply as a trading company rather than a factory?

Yes, if you hold signed manufacturing rights from the factory that builds the machines. The audit still runs at the manufacturing site named in the licence, and the authorisation linking the two entities goes on the file. One page is usually enough.

How long until my first request?

Ten to fifteen business days from a complete file to a decision, and catalogue setup can run in parallel. Requests start as soon as the listing is indexed; there is no probation period for new suppliers.

Do you require exclusivity or a minimum volume?

Neither. There is no exclusivity clause and no minimum number of listings. You keep selling through your own channels, in your own markets, at your own prices.

Can I add product families later?

A scope extension needs evidence for the new family only: its certificates, the model list and a walk of the cell that builds it. The rest of the file is not re-opened, and the existing badge stays live while it is reviewed.

What happens if the application is refused?

A refusal names which of the six criteria failed, so it is a to-do list rather than a verdict. Re-apply when that gap closes — the file starts again at day zero, but documents that have not changed are reused.

Ready, or nearly ready?

If the six documents are in hand, the application takes ten minutes. If one is missing, write to the desk first — it will tell you which document will hold the file up, and what to send instead. That answer is free and usually saves a week.

WhatsApp