This site uses cookies to remember your language and measure which pages help. Accept all, or keep only what is necessary. Details in our Privacy policy.

Skip to main content

Q4 machinery sourcing week: container programmes up to 12% off

Claim offer

Earthworks & site

All use cases →
6 industry domains · 29 use-case pages · one equipment recommendation eachAll industry solutions →
CMSELL
Behind every order, one sourcing team

From factory search and audit to shipment and spares — the same people see it through, so you are not handed between desks.

About CMSELL

Before you pay, lock the risk down

Escrow release · pre-shipment inspection · dispute handling · after-sales spares
100%Orders under escrow
48hTerms & quote reply
4Protection points
How protection worksPayment methodsProtection terms go straight into the order — no separate contract to sign. Read the full terms
  1. Home
  2. Knowledge
  3. Warranty & Spare-Parts Terms
  4. Warranty and Spares: Two Clauses That Decide Uptime
CMSELL · KNOWLEDGE

Warranty and Spares: Two Clauses That Decide Uptime

Warranty covers the part; spares cover the downtime. Two clauses decide whether a failure costs a day or a month, and both are negotiable at order.

Factory worker inspecting machinery on a production floor
Warranty answers “who pays for the part”; the spares clause answers “how long we stop”.

Warranty and spares answer different questions. Warranty says who pays for a failed part. The spares clause says how long the machine stands still. A contract with the first and not the second covers the cheapest part of a breakdown.

1Why it matters

Downtime cost usually exceeds part cost by an order of magnitude. Yet most orders negotiate warranty length for hours and never discuss parts availability, lead time or where spares are held.

2Two clauses, four terms

Clause Term to negotiate
Warranty Duration, hours limit, what is excluded
Warranty Who pays freight on a claim
Spares Availability period after delivery, typically 10 years
Spares Maximum lead time for critical parts

3Terms worth arguing about

Term Weak Strong
Duration 12 months 12 months or 2,000 h, whichever first
Freight on claim Buyer pays Seller pays if defect confirmed
Parts availability “As long as available” 10 years from delivery
Critical part lead time Not stated ≤ 2 weeks, or stock held

4Where warranty terms go wrong

  1. Duration without an hours limit. A machine running 20 h/day consumes warranty in months.
  2. Freight excluded. A covered part that costs a container to return is not covered.
  3. Wear parts silently excluded. Confirm the list, not the principle.
  4. No spares availability term. Support ends when the model does.

5Numbers to fix before you enquire

Item Range Effect
Warranty 12–24 months or 2,000–6,000 h Coverage
Parts availability 8–15 years Support life
Critical lead time 1–6 weeks Downtime
Freight on claim Per contract Claim value

6Tools & next

Send your warranty section and we will return the four terms to add. Related reading: after-sales arrangements, and how to file a claim that holds.

Key facts. Warranty and spares answer different questions: warranty covers who pays for a failed part, while the spares clause covers how long the machine stands still, and downtime usually costs an order of magnitude more than the part. Four terms are worth negotiating: warranty duration with an hours limit, typically 12–24 months or 2,000–6,000 hours whichever comes first; who pays freight on a confirmed claim; parts availability after delivery, commonly ten years; and a maximum lead time for critical parts, ideally two weeks or stock held locally. A machine running 20 hours a day consumes a calendar-based warranty in months. Wear parts are often excluded and the exclusion list should be read rather than assumed. Support effectively ends when the model does, so availability should be a written term. This article covers warranty and spares terms only; it does not cover legal remedies or insurance.

—

Published 25 November 2026 · 3 min read · Knowledge column.