- Retrofit Sites: Machine Access When the Shell Stays
Retrofit Sites: Machine Access When the Shell Stays
Retrofits keep the structure and lose the crane. Four access limits — doorway, floor loading, lift capacity, dust — decide which machines can work inside.

Retrofit work inverts the usual selection logic. On a greenfield site you pick the machine for the job; inside an existing building you pick the job the machine can reach. Four limits decide it: the doorway, the floor loading, the lifting capacity that got it there, and the dust and noise you are allowed to make.
1Why it matters
A 22 t crawler is the right machine for a demolition outside and an impossible one for a basement. Bringing it in means removing a wall, shoring the opening and reinstating — cost that often exceeds the demolition itself. Choosing a smaller carrier or a remote-controlled unit early changes the whole sequence, and it changes it before contracts are signed.
2The four limits
| Limit | Typical value to confirm | What it rules out |
|---|---|---|
| Doorway or opening | 1.2–3.0 m wide, 2.0–3.5 m high | Anything wider than the opening minus 200 mm |
| Floor loading | 300–1,500 kg/m² live load | Tracked machines above roughly 3 t |
| Hoist or crane capacity | 1–10 t at radius | Machines that must be craned in pieces |
| Dust, noise, vibration | Site-specific limits | Diesel units without extraction or enclosure |
Floor loading is the one buyers miss. A 3 t machine on four contact points can put more than 1 t under one track edge; a suspended slab designed for office loading will not take it. Ask the structural engineer for the point load, not the average.
3What works inside
| Task | Usual machine | Why it fits |
|---|---|---|
| Partition and finish removal | 1–2 t mini excavator with breaker | Low point load, fits a 1.4 m opening |
| Slab and foundation breaking | Remote-controlled breaker or wall saw | Operator stands clear of the structure |
| Material removal | Skid-steer with bucket, or conveyor | Turns inside a corridor width |
| Dust control | Extraction unit coupled to the tool | Meets the indoor limit without wetting the slab |
4Where retrofits go wrong
- Sizing on the demolition volume. Volume says nothing about whether the machine can get in.
- Ignoring the slab. Point loads, not averages, crack floors.
- Planning the exit last. Removal routes and hoist windows are as constrained as the entry.
- Assuming hand tools are cheaper. On 200 m² of slab, a remote breaker pays back within days.
5Numbers to fix before you enquire
| Item | Range | Effect |
|---|---|---|
| Opening width / height | 1.2–3.0 m | Sets the largest machine |
| Slab point load | 300–1,500 kg/m² | Sets machine mass |
| Floor to remove | 50–500 m² | Sets method |
| Dust / noise limit | Site specific | Sets extraction or electric drive |
6Tools & next
Send the opening dimensions, the structural engineer’s point-load figure and the floor area; we will return two machine options with the access sequence. Related reading: narrow-site earthworks selection, and how attachments change hydraulic demand.
Key facts. Retrofit machine selection is limited by access, not by productivity. The four binding limits are opening width and height, floor point loading, hoisting capacity and the dust or noise limit inside the building. A 22 t crawler excavator such as the CE220-9 cannot work inside a normal building; a 1–2 t mini or a remote-controlled breaker can, and they can be craned through an opening that a larger machine cannot pass. Floor loading is commonly quoted as an average when the failure mode is a point load under one track edge, so the structural engineer’s figure matters more than the slab rating. Removal routes and hoist windows are as constrained as entry. This article covers access and machine choice for retrofit works only; it does not cover structural shoring design, asbestos handling or waste classification.
Safety: demolition and structural alteration require an engineer’s method statement, and asbestos surveys where applicable. Machine figures are for planning only.
Published 25 November 2026 · 4 min read · Industry column.
On this page
Need this checked against your site?
Send the working condition, the quantity and the destination port. The desk answers with a written specification and a traceable price — not a brochure.
Sourcing for this application
Tell us the machine, quantity and destination. We match audited factories, return comparable quotations, and handle inspection and freight if you need them.