Behind every order, one sourcing team

From factory search and audit to shipment and spares — the same people see it through, so you are not handed between desks.

About CMSELL

Before you pay, lock the risk down

Escrow release · pre-shipment inspection · dispute handling · after-sales spares
100%Orders under escrow
48hTerms & quote reply
4Protection points
How protection worksPayment methodsProtection terms go straight into the order — no separate contract to sign. Read the full terms
  1. Home
  2. Insights
  3. News
  4. Why Two Quotes for the Same Machine Differ
CMSELL · JOURNAL

Why Two Quotes for the Same Machine Differ

Same model, same tonnage, two prices. Between them sit four variables: configuration edges, trade terms, payment structure and what each quote leaves out.

Two machine quotations and a calculator on a desk, the usual starting point for comparing offers line by line
Comparing two offers line by line takes an hour. Comparing totals takes a minute and settles nothing.

Two quotes for the same model, the same tonnage, the same year. One is noticeably higher. Nothing improper happened.

Four variables sit between the two numbers, and only one of them is the machine. A jaw crusher quoted twice is still one machine; what changes is where each supplier draws the edge of the delivery.

1Start with the scope line, not the total

Both quotes say PE 600×900. One includes a vibrating feeder, the discharge conveyor and the starter panel. The other prices the crusher alone.

Read the scope table before the price, because two documents describing different deliveries cannot be compared on price. Ask one question first: what exactly arrives at the port?

2The trade term moves cost and risk

FOB, CFR and CIF each hand a different amount of cost and risk to the seller. Under FOB the buyer pays the main carriage and insurance. Under CIF the seller arranges both, to a named port, at a stated insured value.

Two consequences buyers miss. A CIF price hides freight inside the equipment price, so it cannot sit in the same column as FOB. And insurance arranged by the seller usually covers the sea leg to the named port, not the inland run to your site.

Normalise before comparing: same Incoterms 2020 rule, same named port, same currency.

3The payment schedule is a price

Sight transfer, a deposit with balance against documents, and a letter of credit carry different costs, and someone pays them.

A seller who waits sixty days has priced that wait into the offer. A seller paid in full before shipment has taken the financing cost out. This is why a lower headline can cost more once your own cost of capital is counted.

Put each schedule on one line: how much, when, against which document.

4What the quote leaves out

Spares, commissioning, operator training, warranty response time and the validity date change the cost of ownership without changing the headline.

A twelve-month warranty with a forty-eight hour parts commitment is not the same offer as a twelve-month warranty with no parts commitment. The second is cheaper to write and dearer to own.

Variable Where the difference comes from What to ask for
Scope edge Machine only, or machine plus feed, discharge and controls A line-item scope list in identical rows
Trade term FOB, CFR or CIF, and which port is named The same Incoterm and port from every supplier
Payment schedule Sight transfer, deposit plus balance, or letter of credit Amount, timing and triggering document
Exclusions Spares, commissioning, training, warranty response A written exclusions column
Validity Thirty days, or fixed for the year The base date and the exchange rate used

5Three mistakes that survive the first comparison

Comparing totals instead of line items. A total is the end of a calculation you have not seen.

Mixing trade terms. An FOB offer and a CIF offer for the same machine are different products, not different prices.

Ignoring the validity date. An offer held for thirty days is a different commitment from one held for a year, and the difference is real money when the currency moves.

6Compare in five rows

  1. Put both scope lists into one table, same rows, same units, and mark gaps as excluded.
  2. Convert both offers to the same Incoterm and the same named port.
  3. Write both payment schedules as amount, timing and document.
  4. Add the spares, commissioning and warranty response you actually need.
  5. Compare the five rows, then read the total as a conclusion rather than a starting point.

If two suppliers still differ after that, the gap sits in the machine or in the margin. Both are legitimate answers. What you removed is the gap caused by comparing unlike things. The PE 600×900 listing shows the terms a quote has to match, and landed cost shows the lines that sit outside the equipment column.

Key facts. A 20 ft container holds roughly 33 m³ and a 40 ft container roughly 67 m³, which decides whether a station ships whole or in parts. The first six digits of an HS code are internationally uniform, and the digits after them are set nationally, so two similar machines can land on different duty lines. FOB, CFR and CIF are three of the eleven Incoterms 2020 rules, and they differ in who arranges carriage and insurance, not in who owns the machine. Warranty is commonly written as twelve months or 2,000 running hours, whichever comes first. Quotation validity is commonly thirty days, which makes the base date and the exchange rate part of the price.

Scope note. This piece covers comparison method only. It states no price level for any machine, assesses no individual supplier, and does not replace the commercial terms of a signed contract.

Next step. If two offers in hand do not reconcile, send both scope lists to the sourcing desk. We will put them into the five-row table and return the differences as a written list.

Safety: nothing here changes a supplier’s technical responsibility. Duty, insurance and payment terms must be confirmed against the signed contract and the named Incoterms rule.

Published 25 November 2026 · 5 min read · Journal column.

Need this checked against your site?

Send the working condition, the quantity and the destination port. The desk answers with a written specification and a traceable price — not a brochure.