This site uses cookies to remember your language and measure which pages help. Accept all, or keep only what is necessary. Details in our Privacy policy.

Skip to main content

Q4 machinery sourcing week: container programmes up to 12% off

Claim offer

Earthworks & site

All use cases →
6 industry domains · 29 use-case pages · one equipment recommendation eachAll industry solutions →
CMSELL
Behind every order, one sourcing team

From factory search and audit to shipment and spares — the same people see it through, so you are not handed between desks.

About CMSELL

Before you pay, lock the risk down

Escrow release · pre-shipment inspection · dispute handling · after-sales spares
100%Orders under escrow
48hTerms & quote reply
4Protection points
How protection worksPayment methodsProtection terms go straight into the order — no separate contract to sign. Read the full terms
  1. Home
  2. Knowledge
  3. How to Write an Effective RFQ
  4. Writing an RFQ a Factory Can Actually Quote
CMSELL · KNOWLEDGE

Writing an RFQ a Factory Can Actually Quote

An RFQ fails when the supplier has to guess. Six blocks — duty, envelope, power, standard, delivery and commercial terms — make bids comparable.

Financial papers, calculator and pencils arranged on a desk
Comparable bids come from identical questions, not from identical formats.

A supplier who has to guess quotes the safest option, usually the largest machine. Six blocks remove the guessing: duty, envelope, power, applicable standard, delivery expectation and commercial terms.

1Why it matters

RFQ quality determines bid comparability. When three suppliers answer three different questions, price comparison is meaningless — one includes a feeder, one excludes installation, one assumes a different voltage. Normalising after the fact costs more time than writing the six blocks once.

2The six blocks

Block What to state Why it matters
Duty Throughput, product, hours per day, material Sizes the machine
Envelope Site access, foundation, ambient, altitude Rules out unsuitable units
Power Voltage, frequency, phase, starting limit Determines motor and starter
Standard Certification, test basis, acceptance criteria Makes acceptance objective
Delivery Required on-site date, shipping terms Sets production slot
Commercial Payment structure, validity, warranty, spares Makes totals comparable

3Wording that removes ambiguity

Weak Strong
“High capacity” “120 t/h of granite, 0–500 mm feed, 0/20 and 20/40 mm product”
“Suitable power” “380 V, 50 Hz, three-phase, star-delta starting only”
“Good quality” “CE marking with declaration, ISO 9001 certificate, test report per lot”
“Soon” “On site by 15 March, DAP to named address”

4Where RFQs go wrong

  1. One paragraph of prose. Suppliers answer the parts they can and leave the rest blank.
  2. No test basis. Acceptance becomes a negotiation instead of a check.
  3. Commercial terms in a separate email. They change the price and must be in the same document.
  4. No validity date. Prices move; an expired bid is not a bid.
  5. No exclusion list. What the buyer supplies must be as explicit as what the seller does.

5Numbers to fix before you enquire

Item Range Effect
Machines per RFQ 1–5 Supplier attention
Required date 4–24 weeks out Feasibility
Bid validity 15–90 days Price certainty
Payment structure Deposit / balance split Price and risk

6Tools & next

Send your last RFQ and we will return it restructured into the six blocks. Related reading: the seven fields buyers leave out, and how to compare quotations line by line.

Key facts. An effective RFQ removes the need for a supplier to guess, and guessing produces the largest, safest and most expensive option. Six blocks make bids comparable: duty with throughput, product and hours; envelope including access, foundation, ambient and altitude; power with voltage, frequency, phase and starting limit; the applicable standard and test basis; delivery expectation with shipping terms; and commercial terms covering payment, validity, warranty and spares. Weak wording such as “suitable power” should be replaced with a specific voltage and starting constraint, and “good quality” with named certification and a test basis. Commercial terms sent in a separate message change the price and must sit in the same document. A bid without a validity date is not a bid. This article covers RFQ structure only; it does not cover negotiation tactics, contract law or supplier selection scoring.

—

Published 25 November 2026 · 3 min read · Knowledge column.

Need this checked against your site?

Send the working condition, the quantity and the destination port. The desk answers with a written specification and a traceable price — not a brochure.