This site uses cookies to remember your language and measure which pages help. Accept all, or keep only what is necessary. Details in our Privacy policy.

Skip to main content

Q4 machinery sourcing week: container programmes up to 12% off

Claim offer

Earthworks & site

All use cases →
6 industry domains · 29 use-case pages · one equipment recommendation eachAll industry solutions →
CMSELL
Behind every order, one sourcing team

From factory search and audit to shipment and spares — the same people see it through, so you are not handed between desks.

About CMSELL

Before you pay, lock the risk down

Escrow release · pre-shipment inspection · dispute handling · after-sales spares
100%Orders under escrow
48hTerms & quote reply
4Protection points
How protection worksPayment methodsProtection terms go straight into the order — no separate contract to sign. Read the full terms
  1. Home
  2. Knowledge
  3. Arrival Inspection & Commissioning
  4. Arrival Inspection: The 7 Days That Set Warranty
CMSELL · KNOWLEDGE

Arrival Inspection: The 7 Days That Set Warranty

Warranty claims weaken after the first week on site. Five checks in the first seven days preserve the evidence that decides claim or argument.

Processing equipment interior in an industrial plant
Evidence gathered in the first week decides whether a defect is a warranty claim or a debate.

A machine’s warranty is only as strong as the evidence collected in its first week on site. Five checks — packaging, condition, completeness, documentation and trial run — decide whether a later defect is a claim or an argument.

1Why it matters

Damage in transit and defects from manufacture look identical three months later. If the crate was opened without photographs and the machine ran for a week before the first complaint, the supplier can reasonably argue the damage happened on site. Notification windows in most contracts are short, and they start at delivery, not at commissioning.

2The five checks

Check What to record When
Packaging Crate condition, marks, seal numbers Before opening
Condition Photographs of every face, close-ups of damage At unpacking
Completeness Packing list compared line by line At unpacking
Documentation Manuals, certificates, test reports, wiring diagrams Before assembly
Trial run No-load then load, parameters recorded Before handover

3Notification discipline

Situation Action Deadline
Visible transit damage Photograph, notify carrier and supplier Same day
Missing items Written notice against the packing list 3 days
Functional defect Written notice with measurements 7 days
Hidden defect Written notice with evidence Per contract

4Where arrival inspections go wrong

  1. Opening crates before photographing them. The only evidence of transit damage is lost.
  2. Signing the delivery note clean. Signature without inspection weakens every later claim.
  3. No trial-run record. Without parameters, the baseline for later comparison is missing.
  4. Notifying verbally. A phone call is not a notification.
  5. Building the foundation before drawings are checked. The most expensive sequencing error.

5Numbers to fix before you enquire

Item Range Effect
Notification window 3–14 days Claim validity
Trial run duration 2–24 h Baseline
Parameters recorded 10–30 Comparison later
Warranty period 12–24 months Coverage

6Tools & next

Send the delivery date and we will return an arrival checklist matched to the machine’s commissioning steps. Related reading: wear parts life in tonnes, and what a pre-shipment inspection should cover.

Key facts. Warranty strength depends on evidence collected in the first week after delivery. Five checks matter: packaging condition photographed before opening, condition of every face at unpacking, completeness against the packing list line by line, documentation including manuals and test reports, and a recorded trial run from no-load to load. Signing a clean delivery note without inspection weakens later claims, and verbal notification is not notification. Notification windows are commonly three to fourteen days and start at delivery rather than at commissioning. A trial run of two to twenty-four hours with ten to thirty recorded parameters provides the baseline against which later performance is judged. Building foundations before drawings are checked remains the most expensive sequencing error in machine installation. This article covers arrival inspection and commissioning only; it does not cover installation supervision contracts, structural works or statutory inspections.

Safety: commissioning requires isolation procedures, guarding in place and trained personnel; never run a machine for the first time with guards removed. Figures are for planning only.