This site uses cookies to remember your language and measure which pages help. Accept all, or keep only what is necessary. Details in our Privacy policy.

Skip to main content

Q4 machinery sourcing week: container programmes up to 12% off

Claim offer

Earthworks & site

All use cases →
6 industry domains · 29 use-case pages · one equipment recommendation eachAll industry solutions →
CMSELL
Behind every order, one sourcing team

From factory search and audit to shipment and spares — the same people see it through, so you are not handed between desks.

About CMSELL

Before you pay, lock the risk down

Escrow release · pre-shipment inspection · dispute handling · after-sales spares
100%Orders under escrow
48hTerms & quote reply
4Protection points
How protection worksPayment methodsProtection terms go straight into the order — no separate contract to sign. Read the full terms
  1. Home
  2. Knowledge
  3. QC Standards & Sampling
  4. AQL Sampling: What 2.5 Really Accepts
CMSELL · KNOWLEDGE

AQL Sampling: What 2.5 Really Accepts

An AQL of 2.5 does not mean 2.5% defects are acceptable. It means a specific sampling plan, at a stated lot size, accepts a specific number of defectives.

Desk with a tablet showing a task list beside office supplies
A sampling plan is arithmetic: lot size, inspection level and AQL give a sample size and an acceptance number.

An AQL of 2.5 does not mean 2.5% defects are acceptable. It means: for this lot size, at this inspection level, draw this many samples and accept up to this many defectives. The number is per plan, not a percentage of the lot.

1Why it matters

Buyers write “AQL 2.5” into a purchase order and assume it guarantees quality. Suppliers read the same words and know that a large lot with a small sample can pass with a defect rate above 2.5%. Both are using the standard correctly; neither has read the same table.

2How a plan is built

Step Input Example
1 Lot size 1,200 units
2 Inspection level General level II
3 Sample size code letter From the table
4 Sample size 80 units
5 AQL 2.5
6 Acceptance / rejection Ac 5, Re 6

Under that plan, 5 defectives in 80 passes the lot; 6 rejects it. The implied defect rate at the acceptance boundary is around 6%, not 2.5%. That is the difference between a quality level and a sampling plan.

3Choosing the right level

Situation Level Consequence
General consumer goods II Standard risk
Safety-critical parts III or tightened Larger sample, more cost
Low-value, high-volume I Smaller sample, higher risk
First shipment II or III Establish baseline
Repeat, stable supply I with reduced switching Cost control

4Where sampling goes wrong

  1. Treating AQL as a defect percentage. It is an acceptance criterion for a plan.
  2. Sampling only easy-to-reach units. The sample must be random, not convenient.
  3. No defect classification. Critical, major and minor normally carry different AQLs.
  4. Accepting “zero defects” as a plan. Zero acceptance needs a different scheme and a larger sample.
  5. Inspecting at the wrong stage. Final inspection cannot fix a process problem.

5Numbers to fix before you enquire

Item Range Effect
Lot size 50–10,000 Sample size
Inspection level I / II / III Sample size
AQL by class 0.65–4.0 Acceptance number
Defect classes Critical / major / minor Separate plans

6Tools & next

Send the lot sizes and defect classes; we will return the sampling plan for each. Related reading: what a factory audit proves, and what pre-shipment inspection covers on machinery.

Key facts. An AQL value is an acceptance criterion within a sampling plan, not a permitted defect percentage. The plan is built from lot size, inspection level, the resulting sample size code letter, the sample size, the AQL and the acceptance and rejection numbers. For a 1,200-unit lot at general inspection level II with AQL 2.5, the plan is typically 80 samples with acceptance at 5 defectives and rejection at 6, which implies a defect rate near 6% at the acceptance boundary rather than 2.5%. Critical, major and minor defects normally carry different AQLs and therefore different acceptance numbers. Samples must be drawn randomly; convenient sampling invalidates the result. Zero-defect requirements need a different scheme and a larger sample than a standard AQL plan. This article covers sampling plans only; it does not cover test methods, measurement uncertainty or supplier quality agreements.

—

Published 25 November 2026 · 3 min read · Knowledge column.

Need this checked against your site?

Send the working condition, the quantity and the destination port. The desk answers with a written specification and a traceable price — not a brochure.