- Home
- Sourcing guides
- Jaw Crusher Selection Guide
Jaw Crusher Selection Guide
Feed size, target product and throughput: the three numbers that decide a jaw crusher.
What this page covers
Real listings, real factories — no filler.
Feed size, target product and throughput: the three numbers that decide a jaw crusher.
A jaw crusher is specified from the feed backwards. The largest lump in the feed sets the feed opening; the target product size sets the closed-side setting; throughput follows from both plus the material’s work index.
Fix these three numbers first
- Maximum feed lump. The opening must accept the largest lump — typically 80–85% of the feed opening is usable in practice.
- Target product size. Closed-side setting determines the output curve; a setting that is too tight for the material raises wear cost sharply.
- Required throughput. Tonnes per hour at the working setting, not at the brochure maximum.
Parameters that move the price
- Cast vs fabricated frame, and the jaw plate material — the two biggest cost drivers over life.
- Drive configuration: motor power, belt drive vs direct, and whether a starter panel is included.
- Whether the machine is bare, skid-mounted with feeder, or a wheeled mobile plant.
- Wear part pricing and availability — a cheap crusher with expensive jaw plates is expensive.
Where buyers get it wrong
- Buying on maximum throughput figures measured in a different material.
- Ignoring the feeder: a jaw crusher without controlled feed runs at part load and wears unevenly.
- Not asking what the wear parts cost per tonne.
What to send us
Feed material and maximum lump size, target product size, required tonnes per hour, hours per day, power supply available, and whether you need a bare machine or a complete station.
Submit a sourcing request · see manufacturers
Related: mining equipment suppliers · PE 600×900 jaw crusher listing
Questions buyers ask
Can a jaw crusher produce 20 mm aggregate in one pass?
Not economically. A jaw is a primary machine; a 20 mm product normally needs a cone or impact stage after it.
Bare machine or skid-mounted station?
A station costs more up front but controls the feed, which is what actually determines throughput and wear. For aggregate lines, the feeder is not optional.
What wear part costs should I expect?
Ask for jaw plate price and expected tonnes per set in your material. Cost per tonne — not plate price — is the number that matters.
Need specific models or configuration plans?
Tell us the working condition, quantity and destination port — verified suppliers will quote benchmarkable prices.









