This site uses cookies to remember your language and measure which pages help. Accept all, or keep only what is necessary. Details in our Privacy policy.

Skip to main content

Q4 machinery sourcing week: container programmes up to 12% off

Claim offer

Earthworks & site

All use cases →
6 industry domains · 29 use-case pages · one equipment recommendation eachAll industry solutions →
CMSELL
Behind every order, one sourcing team

From factory search and audit to shipment and spares — the same people see it through, so you are not handed between desks.

About CMSELL

Before you pay, lock the risk down

Escrow release · pre-shipment inspection · dispute handling · after-sales spares
100%Orders under escrow
48hTerms & quote reply
4Protection points
How protection worksPayment methodsProtection terms go straight into the order — no separate contract to sign. Read the full terms
  1. Home
  2. Help & protection
  3. Trade Assurance
CMSELL · Order protection

An order that cannot move without the other side

Trade Assurance is one idea, applied five times: the order changes state only when something checkable has happened. Deposit is held rather than paid, goods are inspected against a signed annex, and funds move on acceptance — not on a promise.

  • Five states, each with a written trigger and an evidence set
  • Deposit held by the platform until a state change releases it
  • A case pauses release — it does not cancel the order

Paying a supplier for the first time? The staging is the protection — see how deposits and balances are staged.

Mechanism

Five states, and what moves the order between them

Each state ends with an artefact on the order record. If it is not on the record, the state did not change.

  1. Specification locked

    Model, configuration, tolerances, packaging, Incoterm and ship date go into one annex. From this point the annex is the only yardstick — a brochure or a message thread is not.

    YouRead the annex line by line and sign only what you can measure on arrival.

    SupplierReturns the signed annex and a proforma that repeats it.

    Moves onBoth signatures on the annex

    EvidenceSigned annex · proforma invoice

  2. Deposit held

    The deposit is paid into the order rather than to the supplier's account. It sits with the platform until a state change releases it.

    YouPay to the order reference, never to a personal or third-party account.

    SupplierStarts material booking once the payment is confirmed.

    Moves onPayment confirmed on the order record

    EvidencePayment receipt · order record

  3. Build and inspection

    The machine is built against the annex and inspected by the third party named on the order, against the same annex — not against a catalogue photo.

    YouName the inspection body before the build ends, and the standard it will measure.

    SupplierBooks the inspection and fixes anything the report fails.

    Moves onA passing report uploaded to the order

    EvidenceInspection report · measurement sheets · marked photos

  4. Shipment accepted

    Documents are issued and the buyer checks them against the annex: consignee, port, model, serial numbers and quantity. Acceptance is a document check, not a mood.

    YouCompare the bill of lading and packing list to the annex, line by line.

    SupplierSends the full set and answers discrepancies in writing.

    Moves onBuyer accepts, or the acceptance window lapses

    EvidenceBill of lading · packing list · certificate of origin

  5. Funds released

    The held balance is released to the supplier, or refunded to the buyer where a case has been decided that way. Release is the end state, not a step that can be skipped.

    YouNothing further — unless a case is open, which pauses release.

    SupplierReceives the balance and closes the order.

    Moves onAcceptance, lapse of the window, or a decision

    EvidenceRelease record on the order

Release

Four ways the balance leaves the hold

Three of them are routine. Only the fourth involves anyone judging anything.

How the balance is paid
Explicit

You accept the shipment

The document check passes and you confirm on the order. Release is immediate — there is no waiting period after an explicit acceptance.

Automatic

The acceptance window lapses

If you neither accept nor open a case within the window printed on the order, the balance releases. This is why the window is on the order page and not in an email.

Documentary

Inspection passes and documents are accepted

On orders that settle on documents rather than arrival, a passing report plus an accepted document set is enough. The goods may still be at sea.

Adjudicated

A case is decided

Release or refund follows the decision, in whole or in part. Until then the balance is held, and holding it is not a penalty on either side.

Late shipment

How a missed date is measured, and what it buys you

A date dispute is an evidence question before it is an argument. These are the three ways dates get missed.

Ship date missed

The on-board date on the bill of lading against the ship date on the annex. A booking confirmation is not a shipment.

A new date agreed in writing, or cancellation with the deposit returned once the delay passes the grace period on the order.

Short shipment

Quantity and model numbers on the packing list and bill of lading against the annex.

Price adjustment for the shortfall, or a second shipment at the supplier's freight cost.

Documents late

The date the full set reaches your bank or forwarder, not the date the machine was ready.

Storage and demurrage are attributed to the side that caused the delay, as recorded on the order.

A revised date is not a forgiveness. Agreeing a new ship date in writing keeps the order alive and the deposit held; it does not cancel the buyer's right to claim for the delay already incurred, which is assessed separately if a case is opened.

Off-spec goods

Judged against the annex, not against the brochure

Every machinery dispute sounds like "it is not what I ordered". The only useful question is which line of the annex it deviates from, and who can measure it. That is why the inspection body and the annex clause are named before the build starts.

  • A deviation has to be measurable: a dimension, a model number, a material, a performance figure.
  • It has to be measured by the named body, or by an arrival inspection that follows the same method.
  • Cosmetic differences not written into the annex are not deviations — however visible they are.

Rework or replacement

Where the deviation is fixable and the schedule allows it, the supplier brings the machine to the annex at its own cost, and a re-inspection confirms it.

Price adjustment

Where the deviation is real but acceptable — a different tyre brand, a smaller bucket — the difference is priced and deducted from the balance.

Return and refund

Where the machine cannot serve its purpose, the goods go back and the held funds return to the buyer. Return freight follows the decision, not the loudest letter.

Evidence

Six things a case turns on

A case is decided on the order record. Everything below is generated before the container is sealed — after that, it is reconstruction.

The signed annex

The only yardstick. Everything else is commentary.

The inspection report

From the named body, measuring the annex clauses — not a set of photos.

Timestamped photos and video

Packing, marks, serial plates and damage, taken before the container is sealed.

The document set

Bill of lading, packing list and certificate — the record of what actually moved.

Order-record messages

Written inside the order. A promise made elsewhere is hard to act on.

The release record

What was paid, when, and against which state.

Where this ends

The mechanism, not the contract

The distinction matters at the moment something goes wrong. Buyer protection is the list of what is covered, with the exclusions and time limits written down before you order. Trade Assurance is the machinery that makes those promises checkable: a state that cannot advance without an artefact, and money that cannot move without a state change.

This page describes the mechanism as it runs. Where the two could differ, the coverage list wins — it is the document that says whether a particular loss sits inside the agreement. If you are weighing up whether a case is worth opening, read that page first and come back here for the evidence that would support it.

Questions

Asked before the first order

Seven questions that come up before a buyer relies on the mechanism.

What exactly does Trade Assurance cover?

It covers the order milestones on this page: that the goods match the annex, that they ship by the agreed date, and that funds only move when a state change justifies it. The coverage list, exclusions and claim time limits are set out on Buyer protection — this page is the mechanism, that page is the contract.

Is my deposit held, or does the supplier get it?

On a Trade Assurance order the deposit is held. It is released when a state change occurs, not when it is received. That is the whole difference between paying a supplier and placing an order — the same money, a different owner.

What happens if I never respond?

The acceptance window on the order lapses and the balance releases automatically. The window is printed on the order page and in the confirmation email; if you need longer, open a case before it closes rather than after.

What if the supplier ships late?

The delay is measured from the on-board date on the bill of lading, against the ship date on the annex. A revised date in writing, a price adjustment, or cancellation with the deposit returned — the remedy depends on how far past the grace period the shipment went.

What if the machine arrives in the wrong configuration?

The annex decides. If the report or the arrival inspection shows a deviation from an annex clause, the outcome is rework, a priced adjustment or a return. A deviation from a brochure is not a case; a deviation from a signed line is.

Can I open a case after the machine is installed?

You can, within the claim window on Buyer protection, and installation does not by itself void a claim about configuration. It does make the evidence harder, which is why the inspection is booked before shipment rather than after arrival.

Does this replace the warranty?

No. Trade Assurance governs the order — conformance at shipment, date and funds. What happens in month eight is the warranty on the machine, which is agreed with the supplier and sits outside this mechanism.

Before you place the first order

Send the annex and the proforma you have been given. The desk will read them against each other and tell you which clause will be hard to measure on arrival, which inspection body fits the machine, and where the ship date is optimistic. That check costs nothing and it is the cheapest hour in the whole order.

WhatsApp