Behind every order, one sourcing team

From factory search and audit to shipment and spares — the same people see it through, so you are not handed between desks.

About CMSELL

Before you pay, lock the risk down

Escrow release · pre-shipment inspection · dispute handling · after-sales spares
100%Orders under escrow
48hTerms & quote reply
4Protection points
How protection worksPayment methodsProtection terms go straight into the order — no separate contract to sign. Read the full terms
  1. Home
  2. Help & protection
  3. Buyer protection
CMSELL · Buyer protection

The coverage list behind every order

Buyer protection is not a badge on a listing. It is four promises, each with a trigger, a time limit and an evidence rule — written down before you pay, and applied the same way whether the order is USD 4,000 or USD 400,000.

  • Conformance, payment, delivery date and claims — four, not forty
  • A claim window and a document pack defined for each
  • Exclusions named in the list, not discovered at claim time

Paying a supplier for the first time? The staging is half the protection — see how deposits and balances are held.

Coverage · PO-2026-1187 Example
  • Specification conformance Annex clause vs inspection report Covered
  • Payment safety Deposit and balance held on the order Covered
  • On-time delivery On-board date vs agreed ship date Covered
  • Dispute claims Window, pack and a written decision Covered

Outside this list: used machines without an annex, wear parts, and anything paid off-platform.

4protections per order
30days for a quality claim
0fee to file one
The four protections

Four promises, each with a trigger and a stopping point

A promise with neither is marketing. Every card below says what has to happen, what it buys you, and where it ends.

01

Specification conformance

The machine that arrives matches the annex you signed: model, configuration, materials, and any performance figure that comes with a stated test method. The annex is the yardstick — not a brochure, not a photograph, not "what these usually come with".

Triggers when
An inspection report, or an arrival check run the same way, shows a deviation from a named annex clause.
Stops at
Anything the annex never wrote down: colour, decals, supplier branding, "standard practice". Visible is not the same as agreed.
02

Payment safety

Your deposit and balance sit on the order rather than in the supplier's account, and they leave only when a state change justifies it. It is the same money with a different owner — which is the whole difference between paying a supplier and placing an order.

Triggers when
Payment made to the order reference, with the order running on the platform and the supplier verified at that moment.
Stops at
Transfers to a personal or third-party account, and anything paid off-platform. We cannot hold, pause or return money we never received.
03

On-time delivery

Goods leave by the ship date on the annex, measured on the bill of lading's on-board date. A booking confirmation, a loaded truck outside the factory and a photograph of a container are not shipments.

Triggers when
The on-board date falls past the agreed ship date by more than the grace period printed on the order.
Stops at
Delays the buyer caused — late L/C, late specification approval, late shipping instructions — and documented force majeure suspend the clock.
04

Dispute claims

A route to a remedy that does not depend on the supplier agreeing with you: a window, a defined pack, a written assessment, and three possible outcomes. The remedy is priced against the clause, not against the inconvenience.

Triggers when
A claim filed inside the window, with the pack complete, naming the clause and the remedy being asked for.
Stops at
Consequential loss: lost profit, downtime, penalties from your own customer. The remedy is priced on the goods, not on the business around them.
The line

Covered on one side, excluded on the other

Most claim disappointments come from the right-hand column. It is shorter than the left, and it is written down before you order.

Covered

When the conditions on this page are met

  • Goods that deviate from a clause in the signed annex
  • Non-delivery after the ship date plus the grace period
  • Short shipment against the packing list and bill of lading
  • Damage documented at unload, before the container is emptied
  • A deposit at risk when the supplier never ships at all
  • A remedy agreed in writing, then refused or ignored

Not covered

By this list, whatever the circumstances

  • Payments made outside the order, or to a third-party account
  • Used machines bought as-is, without an annex or an inspection
  • Wear parts consumed in normal use — filters, teeth, belts, tyres
  • Differences the annex never mentioned, however visible
  • Lost profit, downtime, or penalties from your own customer
  • Customs examination, storage and demurrage at destination

A list that covers everything covers nothing. If what went wrong sits on the right, the order is still a contract with your supplier — it is simply not a case we can decide. The five conditions below are what move an order from the right column to the left.

Eligibility

Five conditions that make an order protected

Protection attaches to an order, not to a supplier. These are the five things the order has to carry for a claim to be decidable at all.

Paid to the order reference

The hold only exists where the money entered the order.

Payment receipt matched to the order record.

Supplier verified when the order was placed

A remedy needs a listing, a status, and a party that can be suspended.

Verification status stamped on the order at the time of payment.

A signed annex attached

Without a measurable clause there is nothing to compare the machine against.

Annex file on the order, signed by both sides.

Inspection body named before the build ends

The report has to exist before the container is sealed; afterwards it is reconstruction.

Body and measuring method recorded on the order.

Claim filed inside the window, pack complete

A late or thin pack is the most common reason a valid complaint fails.

Filing timestamp against the window, plus the pack checklist.

Missing one of these does not make an order unsafe — it makes it unprotected. The sourcing desk will read a draft order against this list before you pay, and tell you which line is thin while it is still cheap to fix.

Time limits

How long you have, counted from the event

The clock starts when something happened, not when you noticed. Your order page prints the exact number of days; where it differs from this table, the order wins.

5 days after the ship date

Late shipment or non-delivery

Measured on the bill of lading on-board date. Open the claim while the grace period is running, not after it has closed.

3 days after the document set

Short shipment, wrong model on paper

The document check is a deadline, not a formality. Once you accept the set, the numbers on it become your record.

7 days after unload

Visible damage, missing accessories

Photographs before the container is emptied. After that, damage and shortfall are impossible to separate.

30 days after arrival

Configuration or performance deviation

Enough running time to find the fault, short enough that the machine is still as delivered.

A late claim is not automatically refused. It is decided on the record alone, and a late pack is a weaker pack — which is why the window is printed on the order rather than left in an email.

Claim pack

Six things to have ready before you file

Collected before the container is sealed, this is an hour of work. Collected after delivery, it is a month of argument.

The order and signed annex

The reference the claim hangs on, and the clauses the machine is measured against.

The inspection report

From the body named on the order, with the measurements — not just a pass line.

Timestamped photos and video

Packing, marks, serial plates and the damage itself, taken at unload.

The document set

Bill of lading, packing list, certificate of origin — the record of what moved.

Order-record messages

The promise, the change, the approval. Inside the order, not in an inbox.

The remedy you are asking for

Rework, a priced adjustment or a return. A claim that names its remedy moves faster.

Uploads go on the order, not by email. Files sent to a personal inbox are not part of the record, and cannot be weighed in a decision — however convincing they are.

Filing

What happens after you press send

Four steps, each with a named owner and a document at the end of it. None of them depend on how forcefully the case is argued.

How release is paused
  1. 01 Same working day

    Filed

    You submit the pack on the order. An acknowledgement with a case number comes back, and the disputed amount is marked on the record.

  2. 02 Within 2 working days

    Triaged

    The desk checks the clause, the window and the pack. If something is missing you are told which document — not that the file is "insufficient".

  3. 03 5 to 15 working days

    Assessed

    The supplier answers in writing. Where the measurement is contested, a third-party opinion is arranged against the same annex clause.

  4. 04 Decision, then release

    Decided

    A written decision with one of three remedies, and the release or refund that follows it on the order record. Reasons are given either way.

The clock pauses for two reasons only: while we are waiting on you, and while the supplier has a deadline to answer. It does not pause because the supplier has gone quiet.

Where this ends

Four things this list does not do

It is not a warranty

What fails in month eight is the machine warranty agreed with the supplier. This list governs the order, not the life of the machine.

It is not insurance

Business loss, lost profit and penalties from your own customer sit outside. The remedy is priced on the goods, not on the disruption.

It is not a substitute for inspection

Inspection prevents the failure; protection prices it. An order that skips the first leans entirely on the second.

It is not a way to undo an off-platform payment

Money sent outside the order never enters the hold, so there is nothing to pause, decide or return.

Protection is a floor under the order, not a ceiling over the risk. The rest is specification, inspection and a supplier whose incentives line up with yours.

The document that governs

This page, your order, and the mechanism

This page is the coverage list: what is protected, under which conditions, inside which window, and what it would take to prove a claim. It is written to be read before an order rather than after one — the useful moment to discover an exclusion is while the annex is still a draft.

The order record is the copy that binds. Where an order sets a different window, a different grace period or a different inspection body, that order wins over this page. Where this page and any summary elsewhere on the site disagree, this page wins over the summary.

What this page does not do is describe how money and goods move between those states. That is the order mechanism on Trade Assurance, and the settlement rules on Payment methods. If you are already weighing a claim, read this list first, then take its evidence requirements to the mechanism page.

Questions

Asked before the first claim

Seven questions buyers raise before they rely on a coverage list.

Is every order automatically protected?

No. Protection attaches to an order that carries the five conditions above: paid to the order reference, a verified supplier, a signed annex, a named inspection and a claim inside the window. Most orders carry all five by default. The ones that fail almost always fail on the annex — a proforma and a price list are not a specification.

What does the inspection actually check?

The clauses of your annex, measured with a stated method, by the body named on the order. It is not a beauty parade and it does not predict wear life: it answers one question — does the machine as built match the lines you signed?

Can I claim for a delay the supplier blamed on the factory?

Yes, if the delay runs past the grace period on the order. A supplier's own production problem is not a force majeure event. Force majeure is a documented external event, and the burden of documenting it sits with the supplier.

What if I accepted the documents and then found a shortage?

Acceptance closes the document check, not the claim window. A shortfall that appears at unload is still claimable inside the seven-day window — but the pack has to carry the unload photographs and the packing list, because the paper trail has already said otherwise.

Does opening a claim stop the money?

It pauses release on the disputed portion, which is the point of having the order state at all. It does not refund anything by itself: release or refund follows the decision, and the decision follows the evidence.

Do I have to use CMSELL's inspection body?

No, but the report has to measure the annex with a stated method, and the body has to be named on the order before the build ends. A report commissioned after the fact is accepted only where it follows that same method, clause by clause.

What if the machine is close, but not what the annex says?

Then it is a deviation, and the question becomes whether it is fixable and whether the schedule allows it. Rework, a priced adjustment or a return — the same three outcomes, priced against the clause rather than against the inconvenience.

Check an order against this list

Send the draft annex, the proforma and the inspection plan. The desk will read them against the four protections above and tell you where the order is thin — a clause that cannot be measured, an exclusion you are standing in, or a window that closes before the goods land. The check costs nothing.