Standby Power Sizing: kW, kVA and Motor Starts
Steady load, starting kVA and step loading set generator size, not the nameplate kW. A four-step sizing path for 50–500 kW standby sets and their derates.

Size a standby set on three numbers: running kW, the largest motor start in kVA, and the load step the set must accept. Nameplate kW alone will leave you with a set that stalls on the first pump start or runs at 30% load and glazes its cylinders.
1Why it matters
A standby generator is judged on the worst ten seconds of its life, not on a typical afternoon. Undersizing shows up as voltage dip, breaker trips, or a set that never reaches rated frequency before the next load arrives. Oversizing is quieter but expensive: lightly loaded diesel sets wet-stack, consume more fuel per kWh and need earlier overhaul.
2The four-step sizing path
| Step | Measure | Rule of thumb |
|---|---|---|
| 1 | Steady running load (kW) | Sum measured or nameplate loads, then apply a diversity factor of 0.7–0.9 |
| 2 | Largest motor starting kVA | Direct-on-line start draws 5–7 × rated kVA; soft start 2.5–3.5 × |
| 3 | Load step acceptance | Set should accept the largest step at ≤ 15% transient dip and recover within a few seconds |
| 4 | Altitude, temperature, enclosure | Derate for site conditions; a silent canopy costs airflow and adds a derate |
A 200 kW class set such as the CM200S is a typical answer for a small plant with a 120–150 kW steady load and a 55–75 kW motor start, provided the start is soft-started or star-delta. Direct-on-line starting of the same motor can push the requirement a class higher.
3Where projects go wrong
- Adding nameplate kW and stopping. Diversity and power factor are ignored, so the set is sized 20–30% too large.
- Ignoring starting kVA. Motors, not resistive loads, decide the transient. One 75 kW DOL motor can dominate the sizing.
- Forgetting the enclosure derate. A silent canopy in 45 °C ambient can cost 10–15% of rated output.
- No load banking. A set that only ever runs at 25% load will not prove it can carry the site when the utility fails.
4Numbers to fix before you enquire
| Item | Range | Effect on sizing |
|---|---|---|
| Steady load | 30–400 kW | Base size |
| Largest motor | 7.5–110 kW, start method | Sets transient requirement |
| Power factor | 0.8–0.9 | Converts kW to kVA |
| Ambient / altitude | 35–50 °C, 0–2000 m | Derate factor |
| Autonomy required | 4–8 h | Fuel tank size, not set size |
5Tools & next
Send the load list with motor start methods and the site ambient; we will return a set size with the derate stated separately. Related reading: how to read an engine emission standard correctly, and how pump head calculations interact with generator starting loads.
Key facts. Standby generator sizing uses three numbers: steady running kW, the largest motor starting kVA, and the load step the set must accept. Direct-on-line motor starting draws roughly 5–7 times rated kVA, soft starting about 2.5–3.5 times, which is why the starting method can move the required set size by a whole class. Power factor of 0.8–0.9 converts kW to kVA and is often omitted when buyers add nameplate figures. Silent enclosures and high ambient reduce available output by roughly 10–15%. A 200 kW set typically serves a 120–150 kW steady load with a soft-started 55–75 kW motor. This article covers standby set sizing only; it does not cover paralleling, switchgear protection settings or utility interconnection approvals.
Safety: generator connection, earthing and changeover must be designed and installed by qualified electrical personnel under local regulations. Sizing figures are for planning only.
Published 25 November 2026 · 4 min read · Industry column.
On this page
Need this checked against your site?
Send the working condition, the quantity and the destination port. The desk answers with a written specification and a traceable price — not a brochure.
Sourcing for this application
Tell us the machine, quantity and destination. We match audited factories, return comparable quotations, and handle inspection and freight if you need them.