This site uses cookies to remember your language and measure which pages help. Accept all, or keep only what is necessary. Details in our Privacy policy.

Skip to main content

Q4 machinery sourcing week: container programmes up to 12% off

Claim offer
Source from verified factories
5Machinery domains
350+Product categories
Factory-directSupply on every listing
Learn more

Machinery matched to your duty cycle

Confined sites · uneven ground · high-duty fleets — one solution per industry

5Machinery domains
350+Product categories
OEM & ODMBuild to spec

CMSELL buyer protection

One framework covering payment, quality and after-sales on every order

Secure payment
Escrow-style methods that release funds on milestones
Quality inspection
Pre-shipment inspection against the verification standard
After-sales support
Spare parts and technical follow-up after delivery

Sourcing intelligence for machinery buyers

Market notes, spec breakdowns and price benchmarks — published by the CMSELL desk.

Explore insights
  1. Home
  2. Knowledge
  3. Pre-Shipment Inspection & Packing
  4. Pre-Shipment Inspection: What to Check on a Machine
CMSELL · KNOWLEDGE

Pre-Shipment Inspection: What to Check on a Machine

A machine inspection is not a defect count. Six checks — configuration, function, guards, documents, packing and loading — catch what AQL cannot.

Desk with a tablet showing a task list beside office supplies
Machine inspection is a checklist of functions and documents, not a sample of units.

AQL sampling is built for batches of identical units. A machine is one unit, often one of one. So pre-shipment inspection of machinery is not a defect count: it is six checks — configuration, function, guards, documents, packing and loading — performed while the machine can still be changed.

1Why it matters

Once the container is sealed, every correction costs a shipment. The window between final assembly and loading is the last cheap moment, and it is the moment most buyers leave to a forwarder’s checklist that covers cartons, not machines.

2The six checks

Check What to verify Evidence
Configuration Model, options, voltage, controls match the confirmed spec Photographs with serial plate
Function No-load run, then loaded run at stated parameters Recorded values
Guards and safety Guards fitted, interlocks working, labels present Photographs
Documents Manuals, certificates, test report, wiring diagram Copies taken on site
Packing Export standard, rust protection, ISPM 15 marks Photographs before closing
Loading Securing, lashing, centre of gravity, container condition Photographs inside container

3Functional test versus visual check

Item Visual Functional
Paint and finish Yes —
Rotation direction — Yes
Pressure and flow — Yes
Interlock operation — Yes
Guard fixings Yes —

A visual-only inspection passes machines that do not run. A functional-only inspection misses missing guards. Both are needed, and both are cheap compared with a return shipment.

4Where inspections go wrong

  1. Sample-based thinking. One machine needs a full check, not a sample.
  2. No parameters recorded. “Ran correctly” is not evidence.
  3. Packing checked after sealing. Photographs must be taken before the container closes.
  4. Documents reviewed at destination. Missing manuals are expensive to courier later.

5Numbers to fix before you enquire

Item Range Effect
Test duration 1–8 h Coverage
Parameters recorded 5–30 Evidence
Packing standard Export sea-worthy Damage risk
Notice period 3–10 days Inspector availability

6Tools & next

Book an inspection with the six checks listed, or send your existing report for review. Related reading: what a factory audit proves, and AQL sampling limits.

Key facts. Pre-shipment inspection of machinery differs from product sampling because a machine is usually a single unit rather than a batch. Six checks matter: configuration against the confirmed specification, functional run from no-load to loaded with recorded parameters, guards and interlocks verified in operation, documents including manuals and test reports copied on site, export packing with rust protection and ISPM 15 marks photographed before closing, and loading with securing and centre of gravity recorded inside the container. A visual-only inspection passes machines that do not run, while a functional-only inspection misses absent guards. Parameters must be recorded because “ran correctly” is not evidence. Packing photographs taken before sealing are the only proof of condition at loading. This article covers inspection scope only; it does not cover third-party inspector selection or contractual remedies.

—

Published 25 November 2026 · 3 min read · Knowledge column.

Need this checked against your site?

Send the working condition, the quantity and the destination port. The desk answers with a written specification and a traceable price — not a brochure.

WhatsApp