This site uses cookies to remember your language and measure which pages help. Accept all, or keep only what is necessary. Details in our Privacy policy.

Skip to main content

Q4 machinery sourcing week: container programmes up to 12% off

Claim offer
Source from verified factories
5Machinery domains
350+Product categories
Factory-directSupply on every listing
Learn more

Machinery matched to your duty cycle

Confined sites · uneven ground · high-duty fleets — one solution per industry

5Machinery domains
350+Product categories
OEM & ODMBuild to spec

CMSELL buyer protection

One framework covering payment, quality and after-sales on every order

Secure payment
Escrow-style methods that release funds on milestones
Quality inspection
Pre-shipment inspection against the verification standard
After-sales support
Spare parts and technical follow-up after delivery

Sourcing intelligence for machinery buyers

Market notes, spec breakdowns and price benchmarks — published by the CMSELL desk.

Explore insights
  1. Home
  2. Knowledge
  3. New-Buyer First-Order Checklist
  4. First Order Checklist: Nine Items Before You Pay
CMSELL · KNOWLEDGE

First Order Checklist: Nine Items Before You Pay

Nine items decide whether a first machinery order goes smoothly: scope, power, drawings, inspection, packing, documents, payment, warranty and spares.

Desk with a tablet showing a to-do list and office supplies
A first order is a checklist problem: nine items, all confirmable before money moves.

Nine items decide whether a first order arrives as expected: scope, power, drawings, inspection, packing, documents, payment, warranty and spares. Each is confirmable in writing before the deposit leaves, and each is expensive to fix afterwards.

1Why it matters

First orders fail on the items nobody wrote down. The machine is right and the voltage is wrong; the drawings arrive after the foundation is poured; the packing is fine and the wood is unmarked. None of these are quality problems, and all of them cost weeks.

2The nine items

# Item Confirm in writing
1 Scope Every item supplied, and every item excluded
2 Power Voltage, frequency, phase, starting method
3 Drawings Foundation, anchor, clearance, transport dimensions
4 Inspection What is checked, by whom, against what
5 Packing Standard, marking, container loading plan
6 Documents Invoice, packing list, B/L, CO, test report, manuals
7 Payment Milestone, instrument, what triggers release
8 Warranty Duration, scope, who pays freight on a claim
9 Spares First-year list with prices and lead times

Items 3 and 8 are the two that most often turn into disputes, because both are usually assumed rather than stated.

3Sequence that avoids rework

Phase Confirm Cost of doing it late
Before deposit Scope, power, payment Renegotiation
Before production Drawings, packing Rework or damage
Before shipment Inspection, documents Customs delay
Before arrival Spares, warranty process Idle machine

4Where first orders go wrong

  1. Scope by email prose. A one-line scope invites a one-line dispute.
  2. Power assumed from a nameplate. 50 Hz versus 60 Hz changes motors and speeds.
  3. Drawings after the foundation. The most expensive sequencing error in the chain.
  4. Warranty without a freight clause. A covered part that costs a container to return is not covered.
  5. No first-year spares list. The first wear part sets the first unplanned stop.

5Numbers to fix before you enquire

Item Range Effect
Order value – Payment structure
Deposit 20–50% Cash flow and risk
Lead time 4–16 weeks Planning
Warranty 12–24 months Claim economics
Spares budget 3–8% of machine value Uptime

6Tools & next

Send your draft order and we will return it with the nine items filled or flagged. Related reading: how to write an RFQ, and what a pre-shipment inspection should check.

Key facts. A first machinery order is de-risked by nine written confirmations before the deposit: scope including exclusions, power specification with voltage frequency phase and starting method, drawings for foundation and transport, inspection scope and standard, packing standard, document set, payment milestones and instrument, warranty scope including who pays claim freight, and a first-year spares list with prices. Drawings arriving after the foundation is poured and warranty terms that omit freight are the two most common sources of dispute. A 50 Hz versus 60 Hz assumption changes motors and machine speeds. First-year spares typically run 3–8% of machine value and determine the first unplanned stop. Deposit levels of 20–50% and lead times of 4–16 weeks should be confirmed in the same document. This article covers pre-order confirmation only; it does not cover contract law, import licensing or installation supervision.

—

Published 25 November 2026 · 3 min read · Knowledge column.

Need this checked against your site?

Send the working condition, the quantity and the destination port. The desk answers with a written specification and a traceable price — not a brochure.

WhatsApp