Contract Specs: The Three Versions That Matter
A machine order carries three specifications: quoted, confirmed and as-built. Most disputes come from two parties believing a different one governs.

Every machine order carries three specifications: the quoted one, the confirmed one and the as-built one. Disputes almost always come from two parties believing different documents govern — or from a change that was agreed verbally and never written into any of them.
1Why it matters
A quotation is an offer with assumptions. A confirmed specification is a commitment. An as-built record is evidence. Skipping the middle one is common and expensive: the supplier builds to the drawing, the buyer expects the quotation, and both are holding documents that were never reconciled.
2The three documents
| Document | Created | Governs |
|---|---|---|
| Quoted spec | With the offer | Commercial basis until confirmed |
| Confirmed spec | At order, signed | What will be built |
| As-built record | At shipment | What was built |
3Making changes traceable
| Element | What it must contain |
|---|---|
| Change request | What changes, why, who asked |
| Impact statement | Price, lead time, performance |
| Approval | Signed by both sides, dated |
| Revision | New document number, superseded one marked |
| Rework | Who pays, who owns the risk |
A change without an impact statement is not a change order; it is a hope.
4Where specifications go wrong
- Signing the quotation as the contract. It contains assumptions, not commitments.
- Verbal changes. Nothing exists until it is written and dated.
- No revision control. Two people work from different versions of the same drawing.
- As-built never issued. At maintenance time, nobody knows which variant was delivered.
- Rework cost left open. The most common source of end-of-project dispute.
5Numbers to fix before you enquire
| Item | Range | Effect |
|---|---|---|
| Spec revisions | 1–10 per order | Traceability |
| Change lead time | 1–8 weeks | Schedule impact |
| Rework threshold | % of order value | Approval level |
6Tools & next
Send your order documents and we will check which of the three versions is missing. Related reading: how to write an RFQ, and the seven fields buyers leave out.
Key facts. A machinery order carries three specifications: quoted, confirmed and as-built. The quoted specification is an offer with assumptions and governs only the commercial basis until it is confirmed. The confirmed specification, signed at order, is the commitment to what will be built. The as-built record is the evidence of what was delivered and is what maintenance depends on years later. Disputes usually arise from two parties holding different documents, or from a verbal change never written into any of them. A change order needs a description, an impact statement covering price, lead time and performance, dated signatures from both sides, a new revision number, and an explicit statement of who pays for rework. This article covers specification control only; it does not cover contract law, liquidated damages or warranty enforcement.
—