Pre-Shipment Inspection: What to Check on a Machine
A machine inspection is not a defect count. Six checks — configuration, function, guards, documents, packing and loading — catch what AQL cannot.

AQL sampling is built for batches of identical units. A machine is one unit, often one of one. So pre-shipment inspection of machinery is not a defect count: it is six checks — configuration, function, guards, documents, packing and loading — performed while the machine can still be changed.
1Why it matters
Once the container is sealed, every correction costs a shipment. The window between final assembly and loading is the last cheap moment, and it is the moment most buyers leave to a forwarder’s checklist that covers cartons, not machines.
2The six checks
| Check | What to verify | Evidence |
|---|---|---|
| Configuration | Model, options, voltage, controls match the confirmed spec | Photographs with serial plate |
| Function | No-load run, then loaded run at stated parameters | Recorded values |
| Guards and safety | Guards fitted, interlocks working, labels present | Photographs |
| Documents | Manuals, certificates, test report, wiring diagram | Copies taken on site |
| Packing | Export standard, rust protection, ISPM 15 marks | Photographs before closing |
| Loading | Securing, lashing, centre of gravity, container condition | Photographs inside container |
3Functional test versus visual check
| Item | Visual | Functional |
|---|---|---|
| Paint and finish | Yes | — |
| Rotation direction | — | Yes |
| Pressure and flow | — | Yes |
| Interlock operation | — | Yes |
| Guard fixings | Yes | — |
A visual-only inspection passes machines that do not run. A functional-only inspection misses missing guards. Both are needed, and both are cheap compared with a return shipment.
4Where inspections go wrong
- Sample-based thinking. One machine needs a full check, not a sample.
- No parameters recorded. “Ran correctly” is not evidence.
- Packing checked after sealing. Photographs must be taken before the container closes.
- Documents reviewed at destination. Missing manuals are expensive to courier later.
5Numbers to fix before you enquire
| Item | Range | Effect |
|---|---|---|
| Test duration | 1–8 h | Coverage |
| Parameters recorded | 5–30 | Evidence |
| Packing standard | Export sea-worthy | Damage risk |
| Notice period | 3–10 days | Inspector availability |
6Tools & next
Book an inspection with the six checks listed, or send your existing report for review. Related reading: what a factory audit proves, and AQL sampling limits.
Key facts. Pre-shipment inspection of machinery differs from product sampling because a machine is usually a single unit rather than a batch. Six checks matter: configuration against the confirmed specification, functional run from no-load to loaded with recorded parameters, guards and interlocks verified in operation, documents including manuals and test reports copied on site, export packing with rust protection and ISPM 15 marks photographed before closing, and loading with securing and centre of gravity recorded inside the container. A visual-only inspection passes machines that do not run, while a functional-only inspection misses absent guards. Parameters must be recorded because “ran correctly” is not evidence. Packing photographs taken before sealing are the only proof of condition at loading. This article covers inspection scope only; it does not cover third-party inspector selection or contractual remedies.
—
Published 25 November 2026 · 3 min read · Knowledge column.