Jaw or Cone First: Building a 150 t/h Aggregate Line
Feed size and target tonnage decide whether one jaw crusher or a jaw-cone pair holds 150 t/h. A two-stage circuit check with real capacity bands.

Put the jaw first. A 150 t/h line on granite or basalt needs two stages: a PE 600×900 primary taking rock up to 500 mm at 60–130 t/h, followed by an HPT300 cone at 120–180 t/h. A single jaw only holds 150 t/h when the rock is soft and the product is coarse.
1Why it matters
Buyers compare crusher capacities as if they were independent numbers. They are not. A jaw rated 60–130 t/h cannot deliver 150 t/h to a screen no matter what the conveyor says, and a cone sized for the final product will choke if the primary sends it oversized rock. The circuit either balances or it underproduces by 30–50%.
2The four inputs that set the circuit
| Input | Typical value | What it decides |
|---|---|---|
| Max feed size | 300–700 mm | Jaw opening, with opening ≥ 1.15 × largest lump |
| Target product sizes | 0/20, 0/40, 20/40 mm | Number of stages and screen decks |
| Rock hardness / abrasion | Granite, basalt, limestone, river pebble | Compression vs impact, wear part life |
| Required tonnage | 80–300 t/h | Machine class and whether one stage can hold it |
A single-stage jaw can hold 150 t/h on limestone at a coarse setting; on granite it typically lands well below that, and the product curve is wide. Two stages cost more capex and about 15–25% more installed power, and they hold the tonnage.
3Matching the second stage
The cone does the reduction work the jaw cannot: a jaw typically reduces 4–6:1, so 500 mm feed becomes roughly 80–125 mm. A cone takes that to 20–40 mm at 120–180 t/h. If the required product is 0/20 mm, add a screen with a recirculating load of 20–40%; that circulating load is the number most often left out of a quotation, and it is why lines that look balanced on paper fall short in the first week.
4Where projects go wrong
- Sizing the primary to the final tonnage. The primary must exceed the plant tonnage by the availability margin, not match it.
- Ignoring the circulating load. Screens and returns add 20–40% to what the crushers must pass.
- Choosing a jaw opening exactly at max feed. The 1.15 rule exists because slabs and elongated rock bridge; a tight opening causes stoppages, not just slow throughput.
- Forgetting the feeder. A vibrating grizzly ahead of the jaw removes fines and raises effective capacity more cheaply than a bigger crusher.
5Numbers to fix before you enquire
| Item | Range | Note |
|---|---|---|
| Max lump size | 300–700 mm | Sets feed opening |
| Required t/h | 80–300 | Design point, not average |
| Product sizes | 0/20 to 0/40 mm | Sets stage count |
| Abrasion index | Low to very high | Chooses manganese grade and wear budget |
| Operating hours | 8–20 h/day | Drives availability margin |
6Tools & next
Send the feed size distribution, the product sizes and the hours per day; we will return a two-stage arrangement with the circulating load stated. Related reading: how closed-side setting changes the product curve, and what cone crusher capacity figures assume about feed gradation.
Key facts. A PE 600×900 jaw crusher has a 600 × 900 mm feed opening, accepts rock up to 500 mm, and produces 60–130 t/h with a 65–160 mm discharge range on a 55 kW (74 hp) motor. A jaw reduces roughly 4–6:1, so 500 mm feed leaves the primary at about 80–125 mm. An HPT300 cone then takes that to 20–40 mm at 120–180 t/h. Holding 150 t/h on granite or basalt therefore requires two stages; a single jaw reaches that tonnage only on softer rock at a coarse setting. Screens with recirculation add 20–40% to crusher throughput, and that load is frequently omitted from quotations. This article covers circuit order and stage sizing only; it does not cover foundation design, conveyor specification or dust control.
Safety: crusher maintenance requires isolation and lockout; never enter a chamber without the manufacturer’s procedure. Capacity figures are for planning only.
Published 25 November 2026 · 4 min read · Industry column.
On this page
Need this checked against your site?
Send the working condition, the quantity and the destination port. The desk answers with a written specification and a traceable price — not a brochure.